Laserfiche WebLink
<br />Due to the continuing use of the surface facilities, most areas will not <br />be cleared of structures and reclaimed until mining is completed. At <br />that time portals will be sealed and backfilled. Bench areas will be <br />graded to approximate original contour. Building removal will involve <br />salvaging and selling all usable scrap and disposing of the rest in an <br />approved land fill. The disturbed areas will then be topsoiled to the <br />extent available material permits, then seeded and mulched to establish <br />vegetative cover. <br />-6- <br />