Laserfiche WebLink
<br />Stipulation No. 44 (Technical Revision 6) <br />PRIOR TO ANY DISCHARGE FROM POND 005, THE OPERATOR WILL CONSTRUCT AND <br />EMPLOY A LINED DITCH OR PIPELINE TO CONVEY THE DISCHARGED WATER DIRECTLY <br />INTO THE PURGATOIRE RIVER. <br />Stipulation No. 45 (Techncial Revision 6) <br />THE OPERATOR WILL ADD PAW-7 AS A MONITORING WELL WITH THE SAME <br />REQUIREMENTS AS PAW-5 AND PAW-6. PAW-7 SAMPLING DATA SHALL BE INCLUDED <br />IN THE FOURTH QUARTER HYDROLOGIC MONITORING REPORT FOR 1988 AND ALL <br />PREVIOUS DATA FROM PAW-7 SHALL BE PROVIDED TO THE DIVISION. THE OPERATOR <br />WILL ALSO PROVIDE WELL DESIGN INFORMATION TO THE D N ISION PRIOR TO USING <br />THE POND. <br />Stipulation No. 46 (Techncia] Revision 6) <br />THE OPERATOR WILL COMPLETE CONSTRUCTION AND INSTIGATE USE OF POND 005 <br />WITHIN 60 DAYS OF FINAL APPROVAL OF TECHNICAL REVISION 06 (TR-06). <br />Stipulation No. 47 (Technical Revision 6) <br />THE OPERATOR WILL PROVIDE AN UPDATED FIGURE 1 MAP TO REFLECT THE CHANGES <br />IN STIPULATIONS 43-46 PRIOR TO USING THE POND. <br />Stipulation No. 48 (Minor Revision 19) <br />THE OPERATOR WILL AMEND THE PRESENT BOND FROM 5644,825.00 <br />TO REFLECT THE DISCREPANCIES DISCOVERED DURING THE RENEWAL <br />NEW BOND WILL BE IN PLACE BEFORE JANUARY 25, 1989 OR FINAL <br />NOT BE GRANTED. <br />TO E890, 578.00 <br />PROCESS. THE <br />APPROVAL WILL <br />-4- <br />