My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-08-20_GENERAL DOCUMENTS - C1981012
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981012
>
2001-08-20_GENERAL DOCUMENTS - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2021 2:59:54 PM
Creation date
11/23/2007 7:24:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
8/20/2001
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division will require the operator submit a technical revision responding to the issues <br /> identified below. <br /> Rule 2.01 General Requirements <br /> 1. Please bring this section of the permit application up-to-date. <br /> Rule 2.03 Legal, Financial. Compliance and Related Information <br /> 2. Permit text on page 2.03.6 states "surface and coal ownership within the permit <br /> boundary is owned by Picketwire Processing and North Central Energy". Map 1, <br /> Surface ownership conflicts with this statement. Furthermore, the permit boundary <br /> as shown on Map 1 is the boundary prior to the bond release affecting areas <br /> overlying underground workings. Please correct the permit text and map as <br /> necessary to be consistent and correct. <br /> 3. Please submit a new text page 2.03-7 that identifies the MSHA number for the <br /> mine. Table 2 on page 2.03-9 indicates the mine has an MSHA number. Please <br /> correct as necessary to be consistent. <br /> 4. Please submit a new page updating the language under section 2.03.9. <br /> Rule 2.05 Operation and Reclamation Plan <br /> 5. Please refer to Table 19, Surface Facilities List on page 2.05-7 of the permit <br /> application fir the following questions. <br /> a. Power lines are listed as a facility. Which portion of the lines and poles <br /> traversing the site are the responsibility of the mine to reclaim? Please <br /> identify those sections of line and poles that should be covered under the <br /> reclamation cost estimate. <br /> b. The bio-remediation storage site is listed under both the east and west portal <br /> areas. Is this correct? <br /> C. Please identify the coal stockpile area by name or letter/number designation <br /> in both the text and Map 11. <br /> d. The facility list includes two stacking tubes. Permit text on page 2.05-25 <br /> states "At the raw coal stockpile, coal is dropped through the stacking tube <br /> into the reclaim tunnel...". Aerial photos seem to indicate that the coal is <br /> -12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.