Laserfiche WebLink
subsidi , Tra er Minin Inc. <br />7/83 Utah International sells Trapper Mining Inc. to corporate consortium that <br /> owns Crai ower lant <br />1987 Permit Revision PR-Ol approved (changes in permit boundary, topsoil <br /> stripping, overburden blasting, and pit pumpage in Colt and Browning <br /> its <br />1988 Permit Renewal RN-O1/Permit Revision PR-02 approved (changes in pit <br /> advancements, new pits, environmental baseline data, sediment/erosion <br /> control, o erations descri tion, etc. <br />1993 Permit Renewal RN-02/Permit Revision PR-03 approved (new pits and <br /> advancement of existin its <br />1998 Permit Renewal RN-03/Petmit Revision PR-04 approved (advancement <br /> of its, new its, u date of information in ermit a lication <br />1998 Phase I and II bond release request, SL-O1, approved for 2511.7 acres <br /> Phase I, 1548.0 acres Phase II <br />1999 Phase II bond release re uest, SL-02, a roved for 319.5 acres <br />2000 Five pits aze open on the Trapper Mine; of these, three aze being actively <br /> mined (D, F, and A-South pits), one is being backfilled with ash from the <br /> Crai ower lant Ash it ,and one is tem oraril abandoned E it . <br />2002 Phase II bond release re uest, SL-03, a roved for 592.7 acres <br />2003 Renewal RN-04/Permit Revision-OS approved (advancement of pits, re- <br /> orientation of Pits G and Z. Revised ost-minin too a h <br />2003 Phase III bond release re uest, SL-04, a roved for 1857.7 acres <br />2004 Phase I bond release re uest, SL-O5, a roved for 823.9 acres <br />Technical and Minor Revisions to Permit <br />Technical Revisions and Minor Revisions made to the permit since the last permit renewal (RN- <br />04) aze listed in Table 3, below. <br />Table 3 -Technical Revisions and Minor Revisions since permit renewal RN-04 <br />Revisions since RN-04/PR-OS Approval on 6/30/2003 <br />SL04 AP 11/18/2003 Phase III Bond Release of 1857.7 acres. Released $82,659.00 <br />reclamation liability. <br />SLOS AP 6/11/2004 Phase I Bond Release of 823.9 acres. Released reclamation liability <br />only. No bond monies were returned. <br />SL06 Pending Phase II Bond Release of 830.8 acres. <br />MR190 AP 9/17/2003 Pit limit modification <br />MR191 AP 10/31/2003 Include new Fl haulroad and M9 permit map <br />Trapper Mine Page 4 6129/2005 <br />Midterm Review <br />