Laserfiche WebLink
Section Topic <br />Reclamation delay at <br />2.06.7(5) combined surface/subsurface <br />mines <br />3.02.2(4) Adequacy of bond amount <br />and terms <br />Midterm Review Methodoloey <br />Applicability at Trapper Mine <br />Inapplicable. Surface mine only. <br />Applicable. <br />For this Midterm Review, the Division reviewed the following documents: <br />1. Permit application; <br />2. Revisions made to the permit since the last permit renewal; <br />3. Annual reclamation and hydrology reports; <br />4. Bond surety and reclamation cost estimate; <br />5. Division findings documents and previous Midterm Reviews; <br />6. Notices of violations since last permit renewal, if any. <br />PART II -SUMMARY OF: OPERATIONS, REVISIONS TO PERMIT, VIOLATIONS, <br />STIPULATIONS, VARIANCES, AND BOND <br />Operations <br />Table 2, below, summarizes the history of Permit C-81-010. <br />Table 2 -Summary of history of Permit C-81-010 <br />Date Action <br />1954 - 1958 State, county, and federal coal leases issued for the future Trapper Mine <br />site <br />1972 Utah International, original operator of Trapper Mine, begins <br />environmental studies of the site <br />1976 Colorado Mined Land Reclamation Division issues mining permit C-76- <br />11 to Utah International <br />1977 Minin o erations be in on the site <br />1982 Permit C-81-010 issued, re lacin C-76-11 <br />4/83 Utah International transfers Tra er Mine to its then wholl -owned <br />Trapper Mine Page 3 6/29/2005 <br />Midterm Review <br />