My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51412
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:40 PM
Creation date
11/23/2007 6:46:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
General Documents
Doc Date
5/18/1994
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review -Edna Mine <br />This document presents the results of the Midterm Review of The Pittsburg & Midway Coal <br />Mining Company's (P&M) Edna Mine, conducted by the Colorado Division of Minerals and <br />Geology (the Division). This Midterm Review was conducted to fulfill the requirements of the <br />Colorado Surface Coal Mining Reclamation Act, and Rules 2.08.3, 2.06.2(9), 2.06.3(4), 2.06.5(3), <br />2.06.7(5), and 3.02.2(4) of the Rules and Regulations of the Colorado Mined Land Reclamation <br />Board for Coal Mining, promulgated to implement the Act. <br />Rule 2.08.3 requires that the Division conduct a review of each permit issued, prior to its midterm <br />(2~/z years). Based on this review, for good cause shown, the Division may require reasonable <br />revisions to, or modifications of, the permit provisions to ensure compliance with the Act and <br />Regulations. <br />Rules 2.06.2, 2.06.3, 2.06.5, and 2.06.7 require that during the midterm review, where applicable, <br />experimental practices, mountaintop removal variances, variances from approximate original <br />contour (AOC), and variances from contemporaneous reclamation, respectively, be reviewed by <br />the Division. The Edna Mine does not conduct experimental practices, nor have variances been <br />granted for mountain top removal or approximate original contour. However, the Division has <br />previously granted a variance from contemporaneous reclamation (see Section IV of this <br />document). <br />Rule 3.02.2(4) requires that the Division review the amount of performance bond liability and the <br />terms of acceptance of the bond every 2'/z years. <br />This midterm review consisted of a detailed review of the Edna Mine permit application and <br />previous Division findings of compliance to identify any items that may have been overlooked <br />during the initial review. The Division also reviewed all subsequent revisions and stipulation <br />responses to ensure that all permit commitments and conditions were being followed. Hydrologic <br />monitoring data was reviewed in conjunction with the review of the application to assess the <br />adequacy of the monitoring plan and discussion of predicted hydrologic impacts. Problems and <br />observations from past Division inspection reports were also considered. <br />E4na Minc (C-80.001) May 18, 1999 <br />Midlcmt Rcvicw ] 77iiN Pcrmit Tcnn <br />
The URL can be used to link to this page
Your browser does not support the video tag.