Laserfiche WebLink
<br />t 2.9 Vegetative Debris <br />' Vegetative debris will be randomly scattered over the ROW and temporary use areas <br />after cleanup and seeding is done. Woody debris will not be chipped prior to <br />' redistribution on the ROW. Woody debris spread on the ROW will be "walked down" <br />with a rubber fire tractor. Trees and other vegetation will not be permanently <br />windrowed along the edge of the ROW. <br />' 2.10 Fencing <br />' All damaged livestock fences will be repaired to the landowner's satisfaction. All <br />existing improvements, including fences and gates, will be maintained and repaired to <br />at least pre-construction condition. <br />' Where construction has damaged or removed a natural barrier used for livestock <br />control, a fence will be constructed in its place. The fence will be constructed to BLM or <br />other landowner specifications, asapplicable. <br />' 2.11 Above-ground Facilities <br />' Following construction, all above-ground facilities (e.g., structures, appurtenances, or <br />pipeline) will be painted to blend with the natural surroundings. A reflective material <br />may be used to reduce hazards that may occur when structures are near roads. <br />' Otherwise, anon-glare, non-reflective, non-chalking paint will be used. Basic color <br />selections and applicable uses will be coordinated with the BLM or other landowners. <br />' 2.12 Cleanup <br />Following completion of reclamation, all trash and other solid wastes will be removed <br />' from the ROW, temporary use areas, and laydown areas. All material will be disposed <br />of in an appropriate manner in existing authorized sanitary landfills. No solid waste <br />will be buried along the ROW. After final cleanup, the area will be inspected by the <br />' BLM or other landowner to verify that preconstruction commitments for the ROW and <br />ancillary facilities are satisfied. <br />' 3.0 RECLAMATION SCHEDULE <br />Revegetation activities will be determined in part by construction schedules and <br />' seasonal climatic conditions. Seeding and planting will be coordinated with other <br />reclamation activities to occur as soon after seedbed preparation as possible. The goal <br />will be to complete reclamation in the fall immediately after construction is completed. <br />' If construction continues throughout the fall and reclamation cannot be completed, it <br />will be completed either the following spring or fall based on BLM or other landowner <br />agreements. These guidelines may be revised based on seasonal climatic conditions, <br />' access, on-site conditions, and concurrence by the BLM or other landowners <br />1 <br />Pipelirc Nedamanon Plan <br />Yankee Gulrh Sad~um Atircra6 Prol<ct <br />' American Soda. L.L.P. <br />