My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51374
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:39 PM
Creation date
11/23/2007 6:44:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
12/1/1998
Doc Name
PIPELINE INFORMATION SUMMARY
From
AMERICAN SODA LLP
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' YANKEE GULCH SODIUM MINERALS PROJECT <br />PIPELINE RECLAMATION PLAN <br />' 1.0 INTRODUCTION <br />Reclamation practices for the American Soda, L.L.P. (American Soda) Yankee Gulch <br />Sodium Minerals Project (Yankee Gulch Project) pipeline have been developed from the <br />' following sources: 1) coordination with Bureau of Land Management (BLM) and <br />Colorado Division of Wildlife (CDOW) technical staff; 2) existing reclamation plans <br />contained in plans of development (PODS) for other pipeline projects; and 3) experience <br />' gained from other reclamation projects in Colorado. <br />1.1 Pipeline Reclamation Plan Purpose <br />The purpose of this Pipeline Reclamation Plan (Reclamation Plan) is to describe <br />methods for replacing topsoil, reseeding disturbed areas, controlling erosion, and <br />monitoring reclamation success. <br />' This plan is applicable to the construction of the right-of-way (ROW), improved access <br />roads, temporary use areas, and laydown areas. Any modifications to this plan related <br />' to site-specific conditions will be submitted to the BLM. <br />1.2 Pipeline Reclamation Plan Goals and Objectives <br />The short-term goals of this reclamation plan are to control erosion and sedimentation <br />and to minimize impacts to adjacent land uses. Properly executed construction <br />' practices, optimum scheduling, and timely construction, as described in the pipeline <br />construction section of the Yankee Gulch Project Pipeline Information Summary, will <br />mitigate short-term impacts. <br />Long-term goals include control of erosion and sedimentation, protection of water <br />resources and soils, and restoration of pre-existing land uses and vegetative cover. <br />' These long-term goals will be met through implementation of this Reclamation Plan. <br />Monitoring during the construction and operational phases will ensure that these goals <br />are achieved. <br />' 2.0 RECLAMATION PROCESS <br />' The following sections outline the sequential steps for reclaiming the ROW after the <br />pipeline has been installed and the trench backfilled. The same procedures will be <br />applied to the reclamation of ancillary areas (temporary use areas, improved access <br />roads, laydown areas). Reclamation activities will take place entirely within the <br />established construction ROW except where maintenance is required on adjacent <br />existing ROWs. Work outside the construction ROW would be cleared by the BLM or <br />other landowner before being performed. <br />To prevent the introduction of noxious weeds into disturbed areas, reclamation <br />' equipment, including seeding equipment, will be thoroughly cleaned before entering <br />Rpeh~ Redamaton Plan <br />Yankee GWch Sodium hlinerals ProIM <br />AmeriGn Soda, L.L.P. <br />
The URL can be used to link to this page
Your browser does not support the video tag.