Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4.3 Pipeline Abandonment <br />Upon reaching the end of the useful life of the ROW or portions of this ROW <br />American Soda will contact the BLM and develop an abandonment plan. This <br />will include but not be limited to removal of all surface facilities and rendering <br />the pipeline and ancillary facilities totally safe by purging with an inert gas such <br />as nitrogen. <br />PipeWe Wormaeon Summary <br />YaNme GWL~ SoGum Minerals Project <br />Amenran Soda. L.L.P. <br />23 <br />