Laserfiche WebLink
<br />Stipulation No. R4 <br />KERR COAL COMPANY HAS SUBMITTED A DETAILED BONDING LIABILITY COST <br />ESTIMATE IN RESPONSE TO THE DIVISION'S PRELIMINARY DETERMINATION. <br />THE DIVISION IS REYIENING THE BONDING LIABILITY COST ESTIMATE <br />SUBMITTED BY KERR COAL, AND THE DIVISION, IN CONJUNCION NITH KERR <br />COAL, SHALL MAKE A DETERMINATION OF THE PROPER COST ESTIMATES TO BE <br />USED IN ESTABLISHING THE TOTAL BOND AMOUNT AS SOON AS PRACTICABLE. <br />THEREFORE, THE TOTAL BOND FOR THE MINE SITE (FIRST INCREMENT) IS SET <br />AT ;4,290,800.00, AND KERB COAL SHALL MAINTAIN A BOND IN THAT AMOUNT <br />IN FULL FORCE AND EFFECT; BUT NOT LATER THAN SIXTY (60) DAYS AFTER <br />THE ISSUANCE OF THE DIVISION'S DECISION ON THE PERMIT RENENAL, THE <br />DIYISION SHALL MAKE A DETERMINATION OF ADDITIONAL AMOUNTS WHICH MAY <br />BE REQUIRED, IF ANY, fOR THE KERR COAL MINE SITE. <br /> <br />