My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51326
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:37 PM
Creation date
11/23/2007 6:42:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
General Documents
Doc Date
4/24/1986
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE FOR RN1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LIST OF STIPULATIONS <br /> <br />Stipulations 1 through 3 are ongoing from the previous permit period. <br />Stipulations Rl through R4 have been generated through the renewal process. <br />Stipulation No. 1 <br />KERR COAL IS REQUIRED TO CONSTRUCT ALL DITCHES USING THE DESIGN <br />GRADES RATHER THAN THE GRADES SHOWN ON MAP 16a. IF THIS REQUIRES <br />RELOCATING ANY DITCHES FROM THE LOCATION SHOWN ON THE MAP, THEN A <br />REVISED MAP 16a MUST BE SUBMITTED AT THAT TIME. <br />Stipulation No. 2 <br />KERR COAL IS DIRECTED TO SUBMIT TO THIS DIVISION ON A REGULAR BASIS <br />DATA FROM THE AERIAL VOLUMETRIC SURVEYING PROGRAM DESCRIBED ON PAGE <br />616-124 OF THE ORIGINAL APPLICATION TO DETERMINE WHETHER FUTURE <br />OPERATIONAL EXPERIENCE IS CONSISTENT WITH THE PROJECTED SMELL FACTOR <br />OF 245. <br />Stipulation No. 3 <br />NO LATER THAN 90 DAYS DRIOR TO THE SCHEDULED COMMENCEMENT OF <br />OPERATIONS ON THE SECOND BONDING INCREMENT (AS SHOWN ON MAP 46) KERR <br />COAL MUST SUBMIT DETAILED WORST CASE RECLAMATION COST ESTIMATES TO <br />THE DIVISION FOR REVIEW. ANY REQUIRED ADDITIONAL BOND AMOUNT MUST BE <br />SUBMITTED AND APPROVED PRIOR TO THE COMMENCEMENT OF OPERATIONS ON <br />THAT INCREMENT. A SIMILAR PROCEDURE SHALL BE FOLLOWED FOR ANY <br />SUBSEQUENT INCREMENTS. <br />Stipulation No. R1 <br />THE PERMITTEE IS REQUIRED TO SUBMIT TO THE DIVISION A YEARLY REPORT <br />ON THE PROGRESS OF ALL HYDROLOGIC MONITORING WHICH INCLUDES ALL DATA <br />COLLECTED FOR THAT YEAR AND A DISCUSSION ON ANY CONCLUSIONS WHICH CAN <br />BE DRAWN FROM THE DATA. <br />Stipulation No. R2 <br />KERR COAL COMPANY MILL SUBMIT ALL APPLICABLE MAPS. TABLES, AND TEXT <br />WHICH DESCRIBE THE TIMING AND PROBABLE SEQUENCE OF MINING OPERATIONS <br />AND RECLAMATION ACTIVITIES AS CURRENTLY PROJECTED OURIN6 THE <br />FORTHCOMING PERMIT TERM. THIS INFORMATION MUST BE FULLY SUBMITTED <br />NITHIN 90 DAYS OF PERMIT RENEWAL. <br />Stipulation No. R3 <br />DUE TO THE RE-CALCULATED VOLUME OF THE TEMPORARY OVERBURDEN <br />STOCKPILE, AND DUE TO THE POSSIBILITY OF NOT OBTAINING THE SUDDUTH <br />LEASE. KERR COAL MUST DEMONSTRATE WITHIN 90 DAYS OF PERMIT RENEWAL <br />THAT APPROXIMATE ORIGINAL CONTOUR CAN BE ACHIEVED. THIS SUBMITTAL <br />MUST INCLUDE ALL APPLICABLE IMPS, TABLES, FIGURES AND PERTINENT <br />CALCULATIONS TO FULLY DEMONSTRATE THE ACHIEYABILI~'Y OF ADC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.