Laserfiche WebLink
<br /> <br />2. STORMWATER DISCHARGE PERMIT REQUIRED PRIOR TO CONSTRUCTION OF <br />THE HAUL ROAD AND ALL MINING ACTIVITY. <br />3. WATER RIGHTS AND AUGMENTATION APPROVAL -DOCUMENTATION OF <br />APPROVAL OF WATER RIGHTS AND AUGMENTATION PLAN FROM DISTRICT <br />COURT PRIOR TO CONSTRUCTION OF ALL SEDIMEN"f PONDS AND WATER USE <br />FOR M INING ACTIVITIES. <br />4. ROUTT COUNTY SPECIAL USE PERMIT -PERMIT REQUIRED PRIOR TO <br />CONSTYRUCTION OF HAUL ROAD, IMPACTS TO COUNTY ROADS AND ALL <br />MINING RELATED ACTIVITIES. <br />5. AIR QUALITY PERMIT -PERMIT REQUIRED PRIOR TO CONSTRUCTION OF HAUL <br />ROAD AND MINING ACTIVITIES. IF AIR PERMIT IS NOT REQUIRED FOR HAUL <br />ROAD CONSTRUCTION, SENECA COAL COMPANY MUST SUBMIT <br />DOCUMENTATION OF THIS FACT. <br />6. FEDERAL AND STATE EXPLOSIVES PERMITS -PRIOR TO CONDUCTING ANY <br />BLASTING ACTIVITIES. <br />All these permits have been submitted and the stipulation has been satisfied. <br />STIPULATION NO. 2 <br />PRIOR TO CONSTRUCTION OF POND 011, SENECA COAL COMPANY MUST SUBMIT <br />ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE BOND <br />AMOUNT MUST BE APPROVED BY THE DIVISION. <br />Stipulation 2 has been satisfied by submittal of TR-02. <br />STIPULATION N0.3 <br />PRIOR TO CONSTRUCTION OF TOPSOIL PILE F, SENECA COAL COMPANY MUST <br />SUBMIT ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DIVISION. <br />THE BOND AMOUNT MUST BE APPROVED BY THE DIVISION. <br />Stipulation 3 was satisfied by the submittal of MR-11 which eliminated Topsoil Pile H and <br />transferred the bonding liability associated with Pile H to Pile F. <br />STIPULATION N0.4 <br />PRIOR TO RETENTION OF THE YOAST HAUL ROAD AS PART OF THE POST-MINING <br />LAND USE, A SIGNED CONSENT FORM FROM MANEOTIS SHEEP COMPANY MUST <br />BE SUBMITTED TO THE DIVISION. <br />Stipulation 4 has been satisfied by the submittal ofa signed consent form dated 5-5-96, now <br />contained within the permit document. <br />