Laserfiche WebLink
<br />TECHNICAL REVISIONS <br />TR-Ol, approved I 1-3-95, for revisions to the hydrologic monitoring plan (addition of a site on <br />Grassy Creek and the deletion of sites where well casings failed.) <br />TR-02, approved 1-24-96, proposing a cover area standard for shrub clumps on the reclaimed <br />mine as required by Stipulation 8. <br />TR-03, approved 9-3-96, requesting an incidental permit boundary change to accomodate <br />construction of a deadhead route for a dragline move. <br />TR-04, approved 11-14-96, providing the as-built report and certification for pond 010. <br />TR-O5, approved 5-30-97, providing the reclamation schedule and post-mining topography <br />adjacent to Routt County Road 27 (disturbed by deadhead road.) <br />TR-06, approved 7-28-97, providing a calculation of bond for pond Ol 1, the design slope <br />stability analysis for pond 011, and the addition of topsoil pile J. <br />TR-07, approved 1-16-98, providing as-built diagrams and SEDCAD analysis for Diversion <br />Ditch #2. <br />TR-08, approved 1-10-98, providing as-built report and certification of the haul road, NPDES <br />permit, and water rights information for pond Ol 1. <br />Section IV -Status of Stipulations <br />Following is a list of stipulations issued since the submittal of the original permit application <br />along with the status of each. Stipulations 1 through 9 were included in the original permit <br />findings. The origin of the others is noted. <br />STIPULATION NO. 1 <br />PRIOR TO INITIATING MINE RELATED DISTURBANCE AT THE YOAST MINE, <br />SENECA COAL COMPANY MUST OBTAIN THE FOLLOWING PERMITS AND SUBMIT <br />THEM TO THE DIVISION: <br />1. NPDES PERMIT REQUIRED PRIOR TO CONSTRUCTION OF ALL SEDIMENT PONDS <br />AT THE YOAST MINE. <br />