Laserfiche WebLink
<br />8 <br />Stipulation <br />Number Document <br />Insertion Points Status and Explanation of <br />Required Response <br />No. 1 2.05.6 and 2.10 Compliance satisfied: Discussion <br />Surface 4.05.13 should include context of stipulation, <br />Water Monitoring water quality parameters, and ephemeral <br />Stations Require- nature of streams. <br />ment <br />No.s 2 and 3 2.05.3, 2.05.4 <br />Pond Certification 2.10 and 4.05.6 <br />No. 4 2.05.6 and 2.10 <br />Ground Water 4.05.13 <br />Monitoring Plan <br />Compliance satisfied: Discussion should <br />center around particulars of design, <br />containment capability, and water <br />rights. <br />Compliance satisfied: Discussion should <br />center around distribution of monitoring <br />points and baseline water quality. <br />No. 5 Ground Water 2.05.6 and 4.05.15 Compliance satisfied: However, permit <br />Water Augmentation and plan may have expired, requiring <br />new application upon renewed mining. <br />Discuss general aspects. <br />No.s 6, 8 and 9 2.05.4, 2.05.5 and Compliance satisfied: Discussion should <br />Revegetation 4.15 include full text and letters of <br />Success and agreement. <br />Density Standard <br />~~ No. 7 Herbicide <br />and Pest Control 2.05.3, 2.05.6 <br />and 4.18 Compliance satisfied: Insert general <br />discussion <br />Plan <br />No. 10 2.05.3, 2.07.7 Compliance not satisfied: The <br />Explosives Storage and 4.08 location and construction specifications <br />Facility Const. for the dry mine plan explosives <br /> storage facility must be submitted <br /> prior to construction of the facility. <br />No. 11 Topographic 2.05.4, 2.05.5 and Compliance satisfied: Insert general <br />Configuration of 4.14 discussion. <br />Overburden <br />No. 12 Coal 4.10 Compliance not satisfied: Chemical <br />Processing Waste analysis of coal processing waste must <br /> be submitted within 60 days of <br /> production. <br />No. 13 Culvert 2.05.3, 4.03.1 Compliance not satisfied: The operator <br />Design for Haul and 4.05 must submit certified designs of the <br />Road Specifics- haul roads to be utilized in the dry <br />tions mine plan which show that all culverts <br /> have been appropriately sized. <br />