Laserfiche WebLink
The CONTRACTOR shall understand that the listed dimensions of structures, <br />including concrete slabs and foundations, are approximations only and that in <br />some instances exact measurements are impossible to determine especially in <br />regard to subsurface portions of structures such as concrete foundations and <br />footers. The CONTRACTOR is responsible for verifying all measurements and <br />determining the nature and difficulty of removing structures and concrete <br />material prior to the bid opening. No additional allowance above the price <br />bid will be made on account of structural and concrete material dimensions <br />being different than those listed in the Special Conditions or on account of <br />demolition and removal work being more difficult than anticipated and as <br />reflected in the prices bid on the Bid Schedule. <br />-15- <br />