Laserfiche WebLink
3. Substation Facility - This facility is shown as item 3 on <br />Ex i it 3A and includes one large concrete transformer pad <br />35'Lx8'W; one smaller concrete regulator pad 14'Lx5'W; plus <br />other smaller pads, foundations and footers. Thickness of <br />concrete and type/extent of reinforcing used is unknown. <br />Nature and extent of subsurface items associated with facility <br />also unknown. Facility contains seven large platform or <br />pedestal mount transformers, three platform or pedestal mount <br />regulators, three pole mount transformers, one rectangular <br />metering outfit, plus a structural steel structure or framework <br />and other items associated with the facility. All electrical <br />equipment at the facility containing cooling oils have been <br />tested and found to be free of PCB's (polychlorinated <br />biphemals) with the exception of one regulator located on the <br />south end of the 3-regulator bank which was found to have <br />5.7 ppm (parts per million). This concentration is below the <br />minimum level established by the EPA for PCB disposal <br />regulations. However, the CONTRACTOR must comply with all <br />appropriate statutes relating to the handling, transportation, <br />and disposal of non-PCB cooling oils. <br />4. Switch Gear Building - This structure is shown as item 20 on <br />Exhibit 3A and consists of a corrugated sheet metal and <br />structural steel building measuring 24'Lxl6'Wx10'H with a <br />concrete floor of unknown thickness and type/extent of <br />reinforcing. The building contains a bank of electrical <br />switching mechanisms and related electrical equipment. The <br />rear of the building is damaged. <br />5. Ventilation Fan Facility - The general location of this feature <br />is shown on Exhibit 3A as item 21, and the plan view dimensions <br />of this facility are shown on Exhibit 6F with notations <br />indicating height of structures. Contents remaining inside the <br />structure and outside the facility are not shown. <br />6. Crusher Facility - The general location of this feature is <br />shown on Exhibit 3A as items 22, 23, 24 and 25. The plan view <br />dimensions of the facility are shown on Exhibit 6G. The <br />facility includes the operator's shack, remains of the crusher <br />stand and foundation, the portal mouth conveyor support, the <br />electrical equipment and retaining wall, and the caved mine <br />entry. Depth and thickness of the crusher foundation is <br />unknown, as well as any subsurface features associated with the <br />facility. Type and extent of reinforcing used in the concrete <br />is unknown. <br />-g- <br />