My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51193
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:36 PM
Creation date
11/23/2007 6:36:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
1/9/2007
Doc Name
Landslide Review Memo
From
Byron Walker
To
Janet Binns
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 1(8) (include) The total forces that drove the slide, the resistive forces from side or boundary <br />conditions, and the forces that arrested the slide. <br />Stated as not possible to answer <br />in the form put. This is inherent i <br />to the stability analysis. We can <br />address it after the Phase II <br />re ort. <br />Item 1(9) How the information regarding the cause of the landslide pertains to current and future mining <br />and reclamation o erations at the Tra er Mine. <br />Too complex to answer within Somewhat considered under <br />at least 12 - 18 months. Long-Tenn Potential <br /> Uncertainties portion of the <br /> re ort. <br />Item 2. Please resubmit these charts with dewatering well data over the period from just October 2005 to <br />October 2006. <br />To be provided by December 8, Provided. <br />2006 <br />Item 3. Please enlar a the ma for dewaterin wells. <br />To be provided by December 8, Provided. <br />2006. <br />Item 3 1 Please rovide information ertainin to the de th and screened interval for each well. <br />To be provided by December 8, <br />2006. I did not find this <br />information in the materials <br />rovided. <br />Item 4 Location of dewaterin wells. <br />To be provided no later than Provided. <br />December 8, 2006 <br />Item 5. Discuss the type of monitoring that Mr. Tinucci was conducting, the reasons, duration, and <br />locations. <br />Clarified. To be provided by Provided. Brief discussion provided. <br />December 8, 2006 or in the Phase <br />I re ort <br />Item 6. Please discuss the A a ito monitorin oint. <br />To be provided by December 8, Provided Brief discussion provided. <br />2006 <br />Item 7. Provide the data logs for inclinometers installed in the East Panel Area, and findings regarding the <br />sli surface or surfaces. <br />To be provided by December 8, A number of data logs were Inclinometer monitoring updip of <br />2006 rovided for Z and G its. the G Strike Pit is discussed. <br />Item 7 I) Provide a descri lion of the u ose of these inclinometers <br />Provided <br />Item 7 2 Please discuss if an were removed, and wh <br />Provided. <br />Item 8. Provide a descri lion of the u ose of three "seismic holes".. <br />Provided. Provided <br />Item 8 1 Confirm their existence and an others <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.