Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />041 State :Colorado PermiUjob # : C-81-014 <br />06/11/2007 County :Fremont Abbreviation :none <br />JRS Site :Southfield Mine Filename :C014-041 <br />Permit or other job action :2007 Midterm Review <br />Task description :Replace Topsoil from Stockpile L1 fo East Loadouf <br />,. ,. <br />.. :;. <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Cost Bre <br />Scraper work Team -Scraper :I Cat 627G w/push pull <br />-Push dozer:~NA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck : Water Tanker, 2,SOOGaI. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 50 50 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $60.47 NA NA NA $32.63 $7.50 <br />Operating cosUhour : $119.18 NA NA NA $20.46 $7.33 <br />Ripper op.cosUhour: NA NA NA NA $0.00 NA <br />Operator cosUhour : $24.95 NA NA NA $24.47 $34.24 <br />Unit subtotals : $204.60 NA NA NA $77.56 $49.07 <br />Number of units : 2 0 0 0 1 1 <br />Group subtotals : Work : $409.20 Support : $0.00 Maintenance : $126.63 <br />Total work team cost/hour : $535.83 <br />,, ,: <. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,000 CCY factor : 1.125 volume : 6,750 LCY <br />Source of quantity take-off :Map 15 and Page 2.05.3-60 <br />Source of estimated swell factor :CAT Handbook <br />