Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task A : 038 <br />Date : 06/112007 <br />User: JRS <br />State :Colorado <br />County :Fremont <br />Site :Southfield <br />PermiUjob#:C-81-014 <br />Abbreviation :none <br />Filename : C014-038 <br />Agency or organization name :Colorado Division Of f <br />Permit or other job action :2007 Midterm Review <br />Task description :Backfill and Regra <br />Pond L-2 <br />Basic machine :Cat D9R - 9SU (2005) <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br />And <br />Ownership cost hour <br />Operating cost/hour <br />Ripper op.cosUhour <br />Operator cosUhour <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 600 CCY factor <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization °!° <br />Loose <br />1,125 volume: 675 LCY <br />$72.92 NA <br />$98.84 100 <br />$0.00 0 <br />$32.78 NA <br />$204.53 TotalfleetcosUhour: $204.53 <br />Source of estimated volume :Map 27 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 65 feet <br />Unadjusted hourly production : 1,752.8 LCY/hr <br />Material consistency description <br />enn,nacted fill or embankment <br />Average push gradient : 0.00 % (F <br />Average site altitude : 6,100 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomoosed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.300 /LCY <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />Source <br />Adjusted unit production : 681.60 LCY/hr <br />Adjusted fleet production : 681.60 LCYRv <br />Total job time : 0.99 Hours <br />Total job cost : $203 <br />