My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51118
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:32 PM
Creation date
11/23/2007 6:33:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
7/16/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br />_ . ° =Golder <br />1$iSSOClc'~~~S <br />July 7, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />RE: Summary No. 8: June 27 through July 3, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Dear Mr. Roberts: <br />R~C~IVED <br />JUl f s ~ <br />Division of Minerals and Ceolagy <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of June 27 through July <br />3, 2004. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 39° F to 46° F, and highs ranged from 56° F to 73° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVc <br />construction. Ames conducted Phase IVc construction activities on five days of this seven-day <br />reporting period (June 28 through July 2, 2004). Poly-Flex conducted Phase fVc construction activities <br />on five days of this seven-day reporting period (June 28 through July 2, 2004). <br />Phase IVc <br />Ames continued limited Structural Fill (SF) cut to fill activities along the Phase IVb /Phase IVc tie-in <br />area near the LOB. <br />Ames continued construction of the Leak Detection Trench (L.DT) within Phase IVc along the central <br />section of the VLF, Raven Hill azea. Ames constructed approximately 250 linear feet of LDT. <br />Ames did not haul or place any new Soil Liner Fill (SLF) within the Phase IVc area during this <br />reporting period due to inclement weather. <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />~~03; 9s~-o~sc <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />Phase Nc 08 June 27-July 03 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.