My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51117
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:32 PM
Creation date
11/23/2007 6:33:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
2/7/1985
Doc Name
EMISSION PERMIT 84LA300Fâ(2)â
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- , <br />GENERAL TERMS AND CONDITIONS: <br />1. This permit is issued in reliance upon the accuracy <br />and is conditioned upon conduction of the activity, <br />accordance with this information and with represent <br />only for the equipment and operations or activity <br />! READ ITEMS 6, 7, and 8} <br />d completeness of information supplied by the applicant <br />construction, installation and operation of the source, in <br />ms made by the applicant or applicant's agents. It is valid <br />cifically identified on the permit. <br />2. Unless specifically stated otherwise, the general and <br />mined by the APCD to be necessary to assure cor <br />and, as such, shall be enforceable under the provisic <br />has been granted. Emission limits are imposed to <br />further progress toward attainment of the NAAOS for pc <br />and 25-7-301(i); Section 172(b)(3) of the Federal Cle <br />Air Quality Control Commission Regulation No. 3 c <br />as required by C.R.S. 1973, Sections 25-7-102, 25-7- <br />Air Act, 42 USC 7475(a)(3); and Section IV.D.1.c. c <br />3. Each and every condition of this permit is a material <br />of, a condition hereof shall constitute a rejection of <br />be deemed denied ab initio. This permit may be re <br />Control Division (APCD) on grounds set forth in tht <br />Quality Control Commission (AQCC), including fat <br />4. This permit and any required attachments must be <br />the location set forth herein. With respect to a port <br />revised Air Pollutant Emissions Notice (APEN) (requ <br />source is relocated) should be attached to this perrt <br />as provided in Section IIt.6. of AQCC Regulation <br />5. Issuance (initial approval) of an emission permit <br />of this source. Final approval of the permit must <br />provisions of C.R.S. 1973, Section 25-7.114(4)()) <br />cannot be granted until the operation or activity c <br />in all respects with the conditions of the permit. If <br />of such final approval, which does constitute "fi <br />6. THIS PERMIT AUTOMATICALLY EXPIRES IF you (1 <br />after either the date of issuance of this permit or th <br />to commence as set forth in the permit, whichever i <br />or more, or (3) do not complete construction within <br />sions of the expiration date may be granted by th <br />7. YOU MUST notify the APCD at least thirty days (fi <br />the permitted operation or activity. Failure to do so is <br />tion No. 3., Section IV.H.1., and can result in the i <br />~ecific conditions contained in this permit have been deter- <br />~liance with the provisions of C.R.S. 1973, 25-7-114(4)(8) <br />s of C.R.S. 1973, 25-7-115 after final approval of the permit <br />isure that emissions will not (i) interfere with reasonable <br />rtants as required by C.R.S. 1973, Sections 257-114(4)(g)(I)(B) <br />n Air Act, 42 USC 7502 (b)(3); and Section IV.D.2. of the <br />(2) result in an exceedance of the NAAQS for pollutants <br />5(1)(a)(I), and 25-7-201(1)(b); Section 165(a)(3) of the Clean <br />Air Quality Control Commission Regulation No. 3. <br />t hereof and is not severable. Any challenge to, or appeal <br />entire permit and upon such occurrence this permit shall <br />ed at any time prior to final approval by the Air Pollution <br />3lorado Air Quality Control Act and regulations of the Air <br />to meet any express term or condition of the permit. <br />tained and made available for inspection upon request at <br />e source which is moved to a new location, a copy of the <br />d by law to be submitted to the APCD whenever a portable <br />The permit may be reissued to a new owner by the APCD <br />. 3 upon a request for transfer of ownership. <br />s not provide "final" authority (or this activity or operation <br />secured from the APCD in writing in accordance with the <br />Section IVH. o} AQCC Regulation No. 3. Final approval <br />nences and has been verified by the APCD as conforming <br />APCU so determines, it will provide written documentation <br />'authority to operate. <br />do not commence construction or operation within 18 months <br />date on which such construction or activity was scheduled <br />later, (2} discontinue construction for a period of 18 months <br />t reasonable time of the estimated completion date. Exten- <br />APCD upon a showing of good cause by the permittee. <br />en days for portable sources) prior to commencement of <br />violation of C.R.S. 1973, Sec[ion 25-7-114(4)()) and Regula- <br />iocation of the permit. <br />8. YOU MUST obtain final approval within six months~of the commencement of operation as that term is defined <br />by the AQCC. Failure to obtain final approval will esult in the revocation of the permit. <br />9. Violation of the terms of a permit which has received <br />Control Act or the regulations of the AQCC may re <br />under C.R.S. 1973, Sections 25-7-115 (enforcement) <br />(criminal penalties). <br />'final approval or of the provisions of the Colorado Air Quality <br />>ult in administrative, civil or criminal enforcement actions <br />25-7-121 (injunctions), 25-7-122 (civil penalties) and 25-1-114 <br />APCD 831PcV X0/83) <br />
The URL can be used to link to this page
Your browser does not support the video tag.