Laserfiche WebLink
f <br />Stipulation Status <br />Resolved: 1, 3, 7, 10, 12, 14 <br />Ongoing: 4, 5, 6, 8, 11, 15 <br />Not Complete: 2, 9 <br />Suspended or Contingent: 13 <br />Reports pending: 4, 6, 9 <br />Part IV. Reclamation Bond <br />1. A recalculation of bonding costs by the Division indicates that <br />$10,621.00 is necessary for Bear no. 1, $8,715.00 is required for <br />Bear no. 2, and $53,000 is required for Bear no. 3. These costs <br />reflect higher machinery rental and operating costs and reclamation <br />costs for additional facilities installed at Bear No. 3. <br />Therefore, Bear Coal Co. should increase their reclamation bond by <br />$14,396.00 or submit a reevaluation of reclamation costs by <br />i ~lt~liJ <br />sjv <br />1417E <br />