Laserfiche WebLink
<br />Part III. Status of Stipulations <br />Stipulation 1: MLR No. 1, OSM No. 1, sediment control <br />Status-resolved. <br />Stipulation 2: MLR No. 2, OSM No. 2, flood control complete, seeding, <br /> planting, and certification to be done. <br /> Status-construction. <br />Stipulation 3: MLR No. 3, OSM No. 3, mine discharge <br /> Status-resolved. <br />Stipulation 4: MLR No. 4, OSM No. 4, mine water report <br /> Status-ongoing reporting, due. <br />Stipulation 5: MLR No. 5, OSM No. 5, alluvial monitoring <br /> Status-ongoing monitoring. <br />Stipulation 6: MLR N0. 6, OSM No. 6, annual hydrologic report <br /> Status-ongoing reporting, due. <br />Stipulation 7: MLR No. 7, golden eagle survey <br /> Status-resolved <br />Stipulation 8: MLR No. 8, OSM No. 7, Bear No. 2 backfill monitoring <br />Status-ongoing monitoring. <br />Stipulation 9: MLR No. 9, OSM No. 8, Bear No. 1 and 2 proctor testing <br />Status Bear No. 1 test results yet to be submitted. <br />Stipulation 10: MLR No. 10, OSM No. 9, engineering plan for Bear No. 3 <br />access road <br />Status - resolved. <br />Stipulation 11: MLR No. 11, OSM No. 10, Bear No. 3 road and portal <br />monitoring <br />Status-ongoing monitoring <br />Stipulation 12: MLR No. 12, OSM No. 11, non-coal waste disposal <br />Status-resolved. <br />Stipulation 13: MLR No. 13, OSM No. 12, loadout <br />Status-suspended indefinitely at Bear Coal Company's <br />request due to lack of any plans to build a loadout in the <br />near future. <br />Stipulation 14: MLR No. 14, OSM No. 13, snow removal <br />Status-resolved. <br />Stipulation 15: MLR No. 15, OSM No. 14, subsidence monitoring <br />Status-ongoing monitoring. <br />