My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50808
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:20 PM
Creation date
11/23/2007 6:15:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
6/21/1985
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. Reclamation Plan <br />1. When will tree transplanting (hawthorne, willows) be conducted <br />during this planting season? <br />2. What steps have been taken to monitor revegetation success <br />(herbaceous cover and woody plant density) at Bear no. 1 and no. 2? <br />3. Topsoil excavated from the river channel re-alignment and <br />stockpiles was to have been sampled and analyzed for suitability <br />and fertility. Please submit these analyses. <br />4. Additional reclamation work is required at Bear no. 1 and no. 2. <br />Submit a timetable to ensure completion of these activities <br />(removal of debris and coal/gob, soil replacement, seeding and <br />mulching) before the end of this construction season. <br />5. Bear Coal Co. should substantiate the costs submitted for erosion <br />netting application on reclaimed areas. <br />G. Backfilling and Grading <br />1. Spring 1985 monitoring of the Bear no. 2 portal backfill is <br />required at this time. Please submit the results in accordance <br />with stipulation no. 8. <br />2. Stipulation no. 9 required proctor testing of both the no. 1 and <br />no. 2 portals backfill. Test results for no. 2 have been submitted <br />by West Elk Coal Co. Please submit results for no. 1 portal. <br />3. Stipulation no. 11 requires ongoing monitoring of the no. 3 portal <br />area and access road. Please submit spring 1985 monitoring results <br />for these three stations. <br />H. Revegetation <br />1. Bear Coal Co. should substantiate the claim that freeze-thaw action <br />will be sufficient to cover seed or commit to mechanical covering, <br />e.g. hand-raking or use of a slope chain. <br />I. Subsidence -Rule 2.05.6 <br />1. Bear Coal Co. has never agreed to the installation of two <br />additional subsidence monuments overlying the workings, reference <br />letter from Dan T. Mathews dated November 3, 1982 and memo from Jim <br />Pendleton dated October 19, 1982. This indicates that stipulation <br />no. 15 has never been complied with. Bear Coal Co. should install <br />these two additional monuments or submit a discussion as to why <br />they have not been installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.