Laserfiche WebLink
Attachment A <br />Page 2 <br />Stipulation No. 7 <br />SNUWMASS COAL COMPANY SHALL CONSTRUCT ALL ADDITIONAL <br />LINES AT NORTH THOMPSON CREEK MINE AND LOADOUT SO AS <br />THE DANGER OF ELECTROCUTION TO RAPTORS. THE UESIGiVS <br />SUBMITTED TU AND BE HPPROVEU BY THE DIVISION PRIOR TO <br />Stipulation No. 8 <br />POWERPOLES NNC <br />TO MINIMIZE <br />SHNLL BE <br />CONSTRUCTION. <br />THE OPERATOR SHNLL RESTORE THAT PORTION OF THE LOADUUT HAUL ROAD <br />WHICH DISTURBED PRIME FARMLANDS TO ITS PRE-MINING LAfJD USE OF <br />ACftICULTURE IN NCCORDANCE WITH RULES 2.06.6, 4.25, AND THE PLAN <br />CONTAINED IN THE APPROVED PERMIT NPPLICATION. <br />Stipulation No. 9 <br />THE DIVISION DIRECTS SNOWMASS COAL COMPANY TO INSTALL SUBSIDENCE <br />MUNUMENTATION, AS DESCRIBED WITHIN EXHIBIT 4-H OF THE PERMIT <br />APPLICATION, ABOVE ANY UNDERGROUND WORKINGS INSTALLED WITHIN THE <br />LIMITED EXTRACTION AREAS INDICATED ON MAPS A AND B OF EXHIBIT 4-H. <br />SURFACE SUBSIDENCE MONUMENTS SHALL BE INSTALLED AND SURVEYED AT <br />LEAST ONE MONTH PRIOR TO UNDERMINING. <br />