My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50783
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:19 PM
Creation date
11/23/2007 6:14:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
General Documents
Doc Date
8/22/1983
Doc Name
MINING PERMIT (August 16 1983 to August 15 1988)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NTTACHMENT A <br />Stipulation No. 1 <br />WITHIN ONE HUIVDRED AND TWENTY (120) DAYS OF PERhIIT ISSUANCE, <br />SNOW MASS COAL COMPANY SHALL INSTALL AODITIONAL MONITORING WELLS TU <br />MUIVITOR THE UPPER SANDSTONE OF THE WILLIAMS FUkK FORI4ATIUIV. THESE <br />MUNITORING WELLS MAY BE DRILLED WITHIN THE fVO. 3 MINE TO REDUCE <br />DRILLING COSTS. ALL MONITORING WELLS SHALL BE: 1) PROPERLY <br />SCREENED WITHIN THE ENTIRE SANDSTONE UNIT, AND 2) PROPERLY SEALED <br />AT THE TOP AND BUTTOM TO PREVEfVT THEIR DESTRUCTION, THE SPACING OF <br />THE ADDITIONAL MONITORING WELLS SHALL BE SUBMITTED TO THE DIVISION <br />FOR APPROVAL 60 DAYS FOLLOWING ISSUANCE OF THIS PERMIT. <br />Stipulation No. 2 <br />ALL COLLUVIAL MATERIAL AT THE RUFUSE <br />NUN-TOXIC, NON-COMBUSTIBLE COVER FOR <br />ANALYZED AND APPROVED BY THE DIVISION <br />CRITERIN FOR SUITABILITY FOR TOPSOIL <br />Stipulation No. 3 <br />PILE USED AS TOPSOIL OR <br />THE REFUSE PILE MUST BE <br />AS MEETING THE ESTABLISHED <br />AND/Ok SUBSOIL. <br />WITHIN 90 DAYS AFTEk PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE <br />THE DIVISION WITH A COMPREHENSIVE TREE AND SHRUB PLANTING PLAN. <br />THE PLAN MUST INCLUDE A LIST OF SPECIES TO BE PLANTED, NUMBERS OF <br />EACH SPECIES PER ACkE AND ACRES TO BE PLANTED. THE PLANTING PLAN <br />MUST ALSO DESCRIBE THE PATTERN TO BE UTILIZED IN PLANTING THE PLANT <br />MATERIALS, THE SEASON OF THE YEAR OF PLANTING AND ALL LOCATIONS <br />WHICH WILL BE PLANTED. <br />Stipulation No. 4 <br />WITHIN 90 DAYS AFTER PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE <br />THE DIVISION WITH AN ACCEPTABLE SUCCESS CRITERIN STANDARD FOR SHRUB <br />DENSITY AT THE MINE SITE. <br />Stipulation No. 5 <br />WITHIN 90 DAYS AFTER PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE <br />THE DIVISION WITH AN ACCEPTABLE SPECIES DIVERSITY SUCCESS STANDARD <br />FUR 7HE REVEGETATEU AREAS OF THE MINE. <br />Stipulation No. 6 <br />WITHIN 90 DAYS AFTER PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE <br />THE DIVISION WITH ACCEPTABLE SUCCESS STAIVDARDS FOR COVER AND <br />PRODUCTIVITY FOR THE AREAS TO BE RECLAIMED AT THE LOADOUT <br />FACILITY. ALSO, SPECIES DIVERSITY AND WOODY PLANT DENSITY <br />STANDARDS MUST BE PROVIDED FOk THE TRUCK DUMP - DRYLANO GRASSLAND <br />AREA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.