Laserfiche WebLink
the volumes necessary to be placed on Utose areas of the refuse piles which have not to date been cover <br />soiled or topsoiled. <br />Task 99c <br />This Task item was properly modified to reflect certain swctural demolition at Ute North Portal facilities <br />area. lUso, I noticed Utat one item was properly deleted from Task 99b (South Fan Demolition). <br />In sunun~~uy, I believe the amended estimate is an accurate projection based on reclamation work which <br />remains lobe done at Roadside. <br />