My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50582
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:14 PM
Creation date
11/23/2007 6:05:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/8/2001
Doc Name
ROADSIDE COST ESTIMATES
From
DAN MATHEWS
To
DAVE BERRY
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />899 <br />DATE: May 8, 2001 <br />TO: Dave Berry <br />FROM: Dan Mathews <br />RE: Roadside Cost Estimates <br />At your request, I have reviewed Jim Slark's cost estimate dated April 29, 2001, which lists a total estimate <br />amount of $3,466,239.00, I have also reviewed Jim's amended version of Ute estimate vviUt a wver memo <br />dated May 7, 2001, which "includes all of Ute changes to Ure rcclamation plan from Tecludcal Revisions <br />32, 33, and 35, and eliminates all of the tasks for reclanwlion work that has already been completed." The <br />liability associated with Utis most recent estimate is $3,040,634.00, and Ute memo lists Ute specific tasks <br />which were removed or modified to reflect reclamation work which has been performed, but for which no <br />bond release has occurred. <br />The May 7 metno identifies Ute follov~~ng tasks as having been removed or modified, because reclamation <br />has been completed: <br />Task 006 - Backfill North Decline Area <br />Task 007 - Regtade Treasure Island... <br />Task 008 - Puslt South Fan Concrete Collar into Shaft <br />Task 009 -Push Imported Fill into South Fan <br />Task 010 -Regmde South Fan Area <br />Task 016 -Haul Cover Gom CBA-2 to CRDA# l (volume modified) <br />Task 017 -Haul Cover from CBA-2 to CRDA #2 (volume modified) <br />Task 023 -Rip CBA-1 <br />Task 042 -Replace Topsoil from Stockpile to SouUt Fan <br />Task 046 -Replace Topsoil Gont Stockpile 2 to CRDA #1 <br />Task 047 -Replace Topsoil from Stockpile 2 to CRDA #2 <br />Task 053 -Strip Topsoil at CBA-1 <br />Task 054 - Redistribute Topsoil at CBA-1 <br />Task 055 -Seal Portals and SllaRs <br />Task 061 -Regmde Remaining Coal from Roadside and lJ'I1. Stockpiles <br />Task 062 -Compact Remaining Coal from Roadside and 1J7L stockpiles <br />Task 99c -Demolish and Remove All Swctttres <br />Task 1 I I -Regmde All Soutlt Lease Expansion Roads <br />I agree Utat required reclamation identified in Ure above msk items has been pamially or wholly completed. <br />Although Ute work identified in Use task items has been wholly or partially completed, Urere has been no <br />bond release for any of the listed tasks. Listed task itcros vvlricll have been modified (raUrer than removed) <br />because associated reclamation has not been wholly completed are Tasks 016, 017, 046, 047, 055, and 99c. <br />The remaining reclamation tasks have been fully completed. Modified task iter»s are addressed in more <br />detail below. <br />Tasks 016.017, 046, and 047 <br />In the amended estimate, these task items reflect the fact that 11 acres on CRDA #1 and 7.6 acres on <br />CRDA #2 have previously received cover soil and topsoil. The material volwnes in Ure amended tasks are <br />
The URL can be used to link to this page
Your browser does not support the video tag.