My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50581
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:14 PM
Creation date
11/23/2007 6:05:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
11/6/1997
Doc Name
WEST ELK MINE LANDSLIDE
From
BARR ENGINEERING CO
To
NORM EVERY
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NpV 6'97 15:20 FR BFaRR ENGINEERING 6l2 832 2601 TO 9295595--0626016 P.08i10 <br />'rae Norm Every <br />P1om: Ptdlip B. Soieeag <br />Bn6jseC Wat Esc L43ae--Lade&ds <br />D•rr November 6, 1997 <br />P~ojecf: 082801aRW W001 pace 7 <br />(b) InStatll pond Iiner: <br />• being performed <br />(c) Install stone columns upabpe of parking lot across landslide: <br />• good idea, consistent with Barr's concept at toe of landslide to drain <br />eacess pore pressures and provide additional strength in the <br />colluvium. Need well to pump from stone columns. Cable anchor <br />system within the stone coumns and tied to bedrock as <br />conceptualized by Barr would provide additional strength and still <br />provide the desired drainage. <br />(d) Irmtall Iime atabillzatlon down slope of substation: <br />• good idea, consistent with approach to unsaturate the colluvium. <br />Needs to be tested and coordinated with dewatering wells proposed to <br />be tested by Barr. <br />(e) Construct RCC buttress or Soldier Piles east of Partel: <br />• good idea, consistent with approach to stabilize moving portion of <br />landslide. Need to consider whether a flezible wall or rigid wall is <br />appropriate. A properly constructed soldier pile wall (tied to bedrock) <br />with appropriate lagging will act as a tlesible wall. <br />3. Discussion regarding the proper approach to reduce infiltration into the <br />upslope french drain. <br />• Barr will be reviewing this and tentatively is considering covering alI <br />french drains with an impermeable cover to prevent runoff from entering <br />all french drains. <br />08280I~~6f881-I!CET <br />
The URL can be used to link to this page
Your browser does not support the video tag.