Laserfiche WebLink
INITIATED THAT SURVEY MUST BE SUBMITTED. WITHIN 30 DAYS OF THE MINE <br />PLAN APPROVAL, THE APPLICANT SHALL SUBMIT TO THE REGULATORY <br />AUTHORITY THE RESULTS OF THE LEK SURVEY AND WHAT MITIGATION <br />PROCEDURES WILL BE USED TO MINIMIZE IMPACTS TO SAGE GROUSE AND <br />THEIR HABITATS. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 26: ADEQUATE PROTECTION FOR ACTIVE GOLDEN EAGLE NESTS <br />ADJACENT TO THE MINING SITE MUST BE PROVIDED. THEREFORE, THE <br />FOLLOWING DESCRIBED LANDS ARE CLASSIFIED AND UNSUITABLE FOR <br />SURFACE DISTURBANCE AND OCCUPANCY. PERIODIC ACTIVITY DURING THE <br />NON-NESTING SEASON (JUNE 1 -FEBRUARY 28) WITHIN THE BUFFER ZONE CAN <br />BE APPROVED ON A CASE BY CASEBASIS: FEDERAL LEASE D-047201, T2N, R10W, <br />6TH PM, SEC. 3, S 1/2 SE1/4, SEC. 10, NE 1/4 NE 1/4; FEDERAL LEASE C-02373, T2N, <br />R10W, 6TH PM SEC. 3, E 1/2 SE/4 SW 1/4. <br />Status: This stipulation was satisfied and terminated on27 August 1981. <br />Stipulation No. 27: UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR <br />WILL SUBMIT WITHIN 30 DAYS PLANS FOR CONSTRUCTION OF POWERLINES <br />USING APPROVED GUIDELINES FOR RAPTOR PROTECTION, <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 28: UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR <br />WILL COMMIT WITHIN 30 DAYS TO NOT USING PERSISTENT PESTICIDES UNLESS <br />APPROVED BY THE REGULATORY AUTHORITY AND TO FENCE ANY PONDS THAT <br />CONTAIN TOXIC MATERIALS. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 29: A STATE AIR QUALITY PERMIT IS REQUB2ED BEFORE <br />CONSTRUCTION AND OPERATION CAN BEGIN. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 30: WITHIN 30 DAYS OF ACCEPTANCE OF APPROVAL OF THE MINE <br />PLAN, THE APPLICANT SHALL ENSURE THAT THEIR CULTURAL RESOURCE <br />CONTRACTOR HAS SUFFICIENTLY DOCUMENTED THE 17 "POTENTIALLY" <br />ELIGIBLE SITES SO THAT OSM MAY SUBMIT A REQUEST FOR ELIGIBILITY OR <br />NON-ELIGIBILITY CONCURRENCE FOR THESE SITES TO THE COLORADO SHPO. <br />THE INITIAL DOCUMENTATION ON THE ELIGIBILTTY TEST PROGRAM MAYBE IN <br />DRAFT FORM AND CONCERN I TSELF ONLY WITH THE QUESTION OF ELIGIBILITY. <br />A BRIEF FINAL REPORT ON THE TESTING PROGRAM SHOULD BE SUBMITTED <br />- WITHIN 90 DAYS.- - - - <br />