My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-20_GENERAL DOCUMENTS - C1981018
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981018
>
2004-10-20_GENERAL DOCUMENTS - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 12:09:15 PM
Creation date
11/23/2007 6:00:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
10/20/2004
Doc Name
Proposed Decision & Findings of Compliance for RN4
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 20: WESTERN FUELS MUST SUBMIT, FOR THE REGULATORY <br />AUTHORITY APPROVAL, A DETAILED SAMPLING PLAN INCORPORATING THE <br />REQUESTED CHANGES IN PLOT SIZE AND TRANSECT DESIGN. THIS PLAN MUST <br />BE SUBMITTED PRIOR TO THE COMMENCEMENT OF SAMPLING FOR 1981. <br />Status: This Stipulation was satisfied and terminated on 10 August 1981. <br />Stipulation No. 21: ATRIPLEX CONFERTIFOLIA MUST BE REMOVED FROM THE <br />PROPOSED SEEDMDG/S AND REPLACED BY ATRIPLEX CANESCENS. IN ADDITION, <br />COLORADO WILDRYE WILL BE SUBSTITUTED FOR BLUEBUNCH WHEATGRASS. <br />THE REVISED SEEDMIXES MUST BE SUPPLIED TO THE REGULATORY AUTHORITY <br />WITHIN 30 DAYS OF APPROVAL. <br />Status: This Stipulation was satisfied and terminated on 10 August 1981. <br />Stipulation No. 22: WITHIN 30 DAYS AFTER THE PERMIT HAS BEEN GRANTED, THE <br />APPLICANT MUST PROVIDE THE FOLLOWING INFORMATION TO THE <br />REGULATORY AUTHORITY: SPECIFICATIONS AND CALCULATIONS SHOWING <br />THAT DITCHES ALONG THE IMPROVED SECTION OF CNTY RD 65, THE MINOR <br />ACCESS ROAD, AND THE CONVE YOR MAINTENANCE RD HAVE BEEN DESIGNED <br />TO WITHSTAND THE 10 YEAR-24 HOUR STORM EVENT. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 23: THE APPLICANT SHALL OBTAIN RIGHTS-OF-WAY FROM BLM <br />PRIOR TO THE CONSTRUCTION OF OFF LEASE ROADS, TRANSMISSION LINES, <br />WATER LINES AND FACILITIES AND FOR THIRD PARTY FACILITIES ON THE <br />LEASES. <br />Status: This stipulation was satisfied and ternnated on27 August 1981. <br />Stipulation No. 24: COMPANY HAS NOT SUBMITTED ADEQUATE INFORMATION ON <br />MULE DEER AND ANTELOPE MIGRATION PROBLEMS THROUGH THE AREA OF <br />DISTURBANCE. IN ORDER TO DEVELOP PROPER MITIGATION PLANS FOR THE <br />PROTECTION OF THE INTEGRITY OF MIGRATION ROUTES BRIEFLY IDENTIFIED IN <br />BLM'S FINAL EIS ON THE MOON LAKE PROJECT, THE FOLLOWING STIPULATION <br />HAS BEEN DEVELOPED:THE APPLICANT MUST SUBMIT THE REGULATORY <br />AUTHORITY THE COMPLETE STUDY RESULTS FOR MULE DEER AND ANTELOPE <br />MIGRATION CONSIDERATIONS WITHIN 30 DAYS OF APPROVAL. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 25: DUE TO POOR WEATHER CONDITIONS THE APPLICANT'S <br />SURVEY FOR SAGE GROUSE LEK ACTIVITIES WERE UNSUCCESSFUL. A SURVEY IS <br />BEING CONDUCTED IN SPRING OF 1981 TO DETERMINE IF ANY LEKS DO OCCUR IN <br />THE AREA TO BE DISTURBED. THEREFORE, BEFORE ANY EVALUATION CAN BE- - <br />R <br />
The URL can be used to link to this page
Your browser does not support the video tag.