My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50392
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:35:55 PM
Creation date
11/23/2007 5:55:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
General Documents
Doc Date
1/13/1993
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 8 <br />PRIOR TO UTILIZATION OF THE UNDERGROUND DEVELOPMENT WASTE DISPOSAL <br />AREA, TWIN PINES COAL COMPANY, INC. MUST PROVIDE MASS BALANCE <br />CALCULATIONS WHICH DEMONSTRATE THE MOVEMENT OF MATERIAL TO COVER <br />THE WASTE DISPOSAL AREA WITH TWO FEET OF NON-TOXIC, NON-COMBUSTIBLE <br />SUITABLE PLANT GROWTH MEDIUM IN ACCORDANCE WITH RULE 4.11.4.(2). AS <br />A CONSEQUENCE, THE POST-MINING TOPOGRAPHIC MAP MUST ALSO BE <br />REVISED TO REFLECT THESE CHANGES PRIOR TO UTILIZATION OF THE WASTE <br />DISPOSAL AREA. <br />Status - In Compliance. Terminated <br />This stipulation has been adequately addressed in the November 6, 1984 stipulation <br />resolution summary and was accepted by the Division January 28, 1985. No further <br />responses are required. <br />Stipulation No. 9 <br />PRIOR TO PRODUCING COAL FROM THE TWIN PINES NO. 2 MINE, TWIN PINES <br />COAL COMPANY MUST RECEIVE APPROVAL FROM THE DIVISION FOR THE <br />RECLAMATION PLAN FOR THE TWIN PINES NO. 1 PORTAL AREA. THE <br />RECLAMATION PLAN MUST COMPLY WITH THE REQUIREMENTS OF RULE 2.05.4. <br />AND MUST BE SUBMITTED WITHIN 120 DAYS OF PERMIT ISSUANCE. <br />Status - In Compliance, Terminated <br />The Twin Pines Mine has submitted a reclamation plan for the No. 1 portal area, which is <br />found on pages 98 and 99 of the permit application, as amended by correspondence dated <br />May 23, 1985. This plan has been approved by the Division. <br />Stipulation No. 10 <br />WITHIN 30 DAYS OF APPROVAL OF THIS REVISION OPERATOR WILL FURNISH <br />TWO ADDITIONAL COPIES OF UPDATED DRAWING TP-3, SHOWING NEW <br />LOCATION OF SHOP-OFFICE BUILDING TO THE DIVISION. <br />Status - In Compliance. Terminated <br />This stipulation was imposed on the permit with the conditional approval of MR-4. The <br />operator submitted revised copies of drawing TP-3 on September 23, 1988. <br />Stipulation No. 11 <br />WITHIN 30 DAYS OF ISSUANCE OF THE RENEWED PERMIT, THE OPERATOR MUST <br />APPLY FOR AN AMENDMENT TO THE MINE'S NPDES PERMIT, ADDING THE NORTH <br />Twin Pines Mid-Term Review 10 January 13, 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.