Laserfiche WebLink
T-15 Inlet <br />Regrade and rip rap <br />Drainage below 50 A, T-12, T-13 004 Drainage <br />Rebuild ponds and rip rap outlets and inlets <br />Channelize and rip rap drainage to 004 pond <br />Two rills in replaced topsoil SE of pond T-26 <br />Revegetate and regrade contour ditch <br />Past Rill and Gully reports only addressed erosion in replaced topsoil. Due to the latest <br />CDMG/OSM inspection at Seneca 2-W this 1995 report includes all drainage channels needing <br />repay and replaced topsoil. <br />The continuing wet weather during March and April has hampered the efforts to begin these <br />projects. Work in these areas will start as weather permits and should be complete by November, <br />1995. Any other areas identified while doing this field work will also be repau•ed. <br />