Laserfiche WebLink
Seneca II Mine <br />During March and April 1995, Seneca reclamation supervisor, Roy Karo, walked the reclaimed <br />areas and drainage channels at Seneca 11 mine. 22 areas were identified for repair. See attached <br />aerial photo. Following is a description and remedial action to be taken during the summer <br />construction season, 1995: <br />Down drain from culvert 17A <br />Regrade and rip rap as necessary. <br />Down drain from culvert 24A <br />Regrade and rip rap as necessary. <br />Ditches between Wadge drainage rock check dams. <br />Regrade and rip rap as necessary. <br />Road ditch above and below 18A including upper Y of road <br />Regrade and rip rap as necessary. <br />Inlet to Pecoco Pond <br />Regrade and rip rap <br />Road ditch F1 <br />Regrade <br />Inlet to culvert 34A <br />Regrade and rip rap as necessary <br />Wolf Creek drainage to virgin drainage <br />Regrade and rip rap as necessary <br />Outlet of T-26 <br />Rip rap repair <br />Inlet, Outlet and drainage to T-27 <br />Regrade and rip rap as necessary <br />Outlet to T-30 <br />Regrade and rip rap <br />Reclaimed area East of T-30 <br />Regrade, revegetate, contour ditch <br />Inlet to T-31 <br />Regrade and rip rap as necessary <br />Road ditch at C 1 <br />Regrade <br />Ditch around slack pile at sub station <br />Regrade <br />Spring creek drainage <br />Rebuild T-, T-2 and regrade channel and rip rap as necessary. <br />T-4 Inlet and outlet <br />Finish pond to spec. <br />T-5 inlet <br />Rip rap as necessary <br />T-7 outlet, T-8 inlet <br />Regrade and rip rap <br />