My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50246
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:33:33 PM
Creation date
11/23/2007 5:48:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
General Documents
Doc Date
7/24/1987
Doc Name
RALSTON QUARRY ANNUAL REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br />• <br />A report identifying the crushing days of operation and identifying nll days on <br />which the detonation of blasting materials within 200' of ground surface is included <br />in this annual report. <br />Also included is a progress report on the reclamation identifying areas being re- <br />claimed, the areas in which reclamation is complete and the sucess and failue of <br />these efforts. Also included in this annual report is a report on the seismic mon- <br />itoring of the operation. <br />Also included with this report is a summary of transportation activities on how <br />material was transported off the site. We would request that this information remain <br />confidential and precluded from disclosure until the mining operatinn is terminated. <br />Hydrology: We are not aware of any adverse impacts of the operation on the hydrologic <br />cycle. There is no significant erosion problem and any sedimentation collected <br />has been reused in topsoil applications to sustain new plant life. <br />It is our opinion that the operation is sensitive to this cycle and has improved <br />vegetation. <br />Any complaints directed specifically to Asphalt Paving Co. have been dealt with <br />properly and in a timely manner so as to eliminate any potential problems that may <br />arise. This Company recognizes its reponsibility to constantly be aware of any <br />and all suggested methods for improvements and pledges its continne,l Kest effort <br />for a professional operation. We would note, however, we are not nware of any specific <br />complaints directed toward Asphalt Paving Co. <br />Asphalt Paving Co. appreciates the opportunity to discuss this oleration with you. <br />We are convinced that our relationship with the Zoning Department and the Board <br />of Adjustment is the reason it works so well. <br />C~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.