My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50225
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:33:15 PM
Creation date
11/23/2007 5:47:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
General Documents
Doc Date
5/25/1999
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR SL3
From
Phase II & III
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5 -Bond liability chronology at Havden Gulch iViine <br />Effective Action affecting Lands in permit area Amount of Remaining <br />date bond amount affected by action liability bond liability <br /> increase <br /> (decrease) <br />1/=4)32 Permit issuance Entire permit area, $2.300.000 52,300,000 <br /> including minesite <br /> (current permit) and HG <br /> Loadout <br />3/L9/88 Approval of Phase I 319 acres at minesite (58»,000) L,446,000 <br /> release east of County Road 53 <br />8/94 Bond recalculation Entire permit area (576,687) 1,368,313 <br /> in mid-term revive (recalculation corrected <br /> an arithmetic error) <br />12/5/96 Approval of TR-63: HG Loadout (new (5708,986) 659,327 <br /> Removal of HG permit no. C-92-081) <br /> Loadout from <br /> ermit <br />6/19/97 Approval of Phase I 45.1 acres east of ($108,046.73) $551,280 <br /> release Count Road 53 <br />HGCC still has on deposit with the Division a corporate surety bond in the original reclamation <br />liability amount of $2,300,000. By letter of December 19, 1997, the Division authorized the <br />bond issuer, Aetna Casualty and Surety Company, to reduce remaining liability coverage to <br />$51,280, the current bond liability. <br />Of the current bond liability of 5551,280, the Division proposes to release 5528,718, comprised of <br />$196,271 for Phase II release and 5332,447 for Phase III release. The remaining bond liability will <br />be $22,562, an amount sufficient to assure completion of the remaining reclamation work at the site <br />if the work had to be performed by the Division, including the cost of reestablishing vegetation on <br />any revegetated areas, should those areas fail. The Division estimates its cost to complete remaining <br />reclamation work at the site to be 522,562 (cost estimate dated April 23, 1999). <br />Any person with a valid legal interest which might be adversely affected by this proposed decision <br />may request a formal public hearing before the Mined Land Reclamation Board in accordance with <br />Section 3.03.2(6). Public notice of this proposed decision will be published twice in the Steanboar <br />Pilot for two weeks as soon as possible. Requests for public hearing must be submitted to the <br />Division in writing within thirty days of the first publication in the Stenmbont Pilot. If no hearing <br />is requested within that thirty days, the Division's decision will become final. <br />c:\tkVtemi ne\bondre lease\findin~s <br />Hayden Gulch Mine Page 16 May 26, 1999 <br />Phase II/III Bond Release <br />
The URL can be used to link to this page
Your browser does not support the video tag.