Laserfiche WebLink
RECLAMATION PLAN (cont. ) <br /> ( 5. The steeper slopes of the reclaimed dumps will have the topsoil spread <br /> to a rough grade and scarified as opposed to a finish type grade. In <br /> addition, contour furrows will be placed at approximately ten (10) feat <br /> intervals on the slopes . <br /> 6. Cotter has decided not to supplement the topsoil with waste dump material . <br /> Sufficient topsoil is available on site. <br /> RECLAMATION COSTS <br /> Mulch-hay crimped 2 tons/acre on approximately 11 acres = $ 500.00 <br /> OR: Mulch-wood fibre 1200 lbs/acre on approximately 11 acres = $ 1,700.00 <br /> Erosion Control Structures Dozer and Labor = $ 760.00 <br /> Volume of Graded Doagy #2 Dump approximately 60,000 cubic yards at <br /> approximately $ 0.08/yard = $ 4,800.00 <br /> Volume of Graded JD-8 Dump approximately 120,000 cubic yards at approxi- <br /> mately $ 0.08/yard 1 <br /> Volume of Topsoil approximately 8,815 cubic yards at approximately 1 <br /> $ 0.09/square yard to spread. <br />