Laserfiche WebLink
~.. , • iii iiiiiiiiiiiiiiii <br />~~;°~~R STATE OF C~~UI~O <br />Roy Romer, Gove <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Dlreetor <br />September 21, 1989 <br />Mr. W.D. Lamoreux, President <br />First National Bank of Florence <br />P.O. Box 389 <br />Florence, CO 81226 <br />RE: La Plata Mine Reclamation, File No. C-87-072 <br />Dear Mr. Lamoreux: <br />In response to your letter of September 6, 1989, I have attempted to outline <br />the reclamation plan requirements in somewhat more detail than in my letter <br />of August 21, 1989. If you wish, we would be happy to schedule a meeting to <br />discuss any further questions or concerns you might have in regard to this <br />project. <br />You requested a "specific statement of what the State requires of the <br />reclamation of this project". The reclamation will have to be completed in <br />compliance with the reclamation plan as specified in the "La Plata No. 1 <br />Permit Application" and the "Proposed Decision and Findings of Compliance for <br />the La Plata No. 1 Mine". The referenced documents were sent to you with the <br />letter of August 21, 1989. These documents may not set forth in sufficient <br />detail the specifications necessary for the preparation of contracting <br />documents. It would be the responsibility of the surety to obtain the site <br />data necessary to prepare sufficiently detailed contracting specifications. <br />I have attached a site topographic map which was prepared based on a survey <br />of the portal bench and facilities area which we performed (Attachment A). <br />The map may be of some assistance to ,you. We a]so have aerial photographs <br />of the site which are available for viewing in our office. <br />The bank also needs to be aware that the period of responsibility for <br />revegetation under the bond will extend fora period of at least 10 years <br />following the last year of augmented seeding, pursuant to Rule 3.02.3(1) <br />and (2) of the Coal Re_aulations (Attachment B). Bond release criteria and <br />procedures for seeking bond release are outlined in Rules 3.03.1 and 3.03.2, <br />Sediment control facilities will need to be maintained until a satisfactory <br />stand of vegetation has been established, as specified in Rule 4.05.2(1) and <br />(2) (Attachment C). <br />You requested guidance on specific requirements pertaining to the issues <br />listed in the August 21, 1989 letter. Most of the issues are addressed <br />with varying degrees of specificity within the permit application text and <br />exhibits, as well as the Findings Document. We have provided more detail on <br />a number of the tasks, below. <br />215 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />