Laserfiche WebLink
disturbed areas above the ten foot elevation, and on the access roads. Approximately sixty willow <br />cuttings were planted at the perimeter of each pond. It is hoped that These plants will form a <br />natural sediment bamer over time. <br />Following construction, silt fence was placed immediately below the excavated portion of each <br />embankment in order to minimize sediment transport from the excavation area to receiving <br />streams. <br />B. Comprehensive inspections of the pond construction areas were made on a periodic basis <br />throughout the construction process. Installation and periodic modification of the BMP's <br />described in Section A, above, were completed in the summer and fall of 2000. No significant <br />problems were observed. As an inactive mine, only one inspection was required to be performed. <br />C. No sampling was accomplished. No discharge from any of the ponds was observed <br />before, during or after reclamation. <br />c:~~m~b~~i,,,wmooP <br />4 <br /> <br />