Laserfiche WebLink
' Mined Land Reclamation Division <br />April 14, 1982 <br />Page Two <br />Stipulation 12 <br />Coors Energy Company will propose a seeding rate to be approved by <br />the Division for bractless stickleaf and sandsage (if seeding of either <br />species is determined necessary) on an annual basis at least 30 days <br />prior to initiation of permanent reclamation revegetation seeding each <br />year. <br />Stipulation 13 <br />A proposed method for monitoring revegetation was described by <br />Coors in the letter to MLRD dated December 29, 1981 and subsequently <br />assessed as adequate by Mike Savage in a MLR memorandum to Bob Liddle <br />dated December 30, 1981. Coors Energy Company agrees to the further <br />requirement that monitoring be conducted at least three times (on a <br />biennial basis) for each reclaimed area and that the information be <br />submitted to the Division for review no later than 60 days after the <br />completion of monitoring. <br />A response to Stipulation 18 was submitted to MLRD on March 19, <br />1982 and Coors is awaiting written confirmation from MLRD that the <br />stipulation is resolved. <br />If any of the above matters require further clarification, please <br />call me at my new telephone number, 277-6005. <br />Sincerely yours, <br />O~ ~ ~-~ ~ <br />William S. Robie <br />Corporate Real Estate <br />WSR:bd <br />Enclosure <br />cc: Mr. John Nelson <br />