Laserfiche WebLink
<br />approved permit area can be found in Section 2.04, pages 48-55, <br />Volume I and Section 2.04. <br />Two soil types are found in the approved permit area; the Carracas <br />loam and Nunn loam. The Carracas loam is the main soil disturbed <br />on the currently permitted area. The Carracas loam consists of a <br />surface horizon varying from 0 to 4 inches thick. This horizon is <br />underlain by a subsurface sandy loam or sandy clay loam ranging <br />from 4 to 14 inches in thickness. There have been no potential <br />management problems identified with this soil unit and it is <br />considered a good plant growth medium. <br />On May 7, 1981, the Division approved a technical revision to <br />disturb an additional 9.71 acres to construct a coal handling <br />facility (crusher load-out), bathhouse, fuel storage area, and <br />parking area along the southwestern edge of the existing permit <br />area. The majority of this area was covered by the Nunn loam, <br />which has a clay loam to loamy surface soil, six to eight inches <br />thick, over a clay loam to sandy loam subsoil. This soil type is <br />characteristic of the alluvial valley floor along Stollsteimer <br />Creek. The depth of this soil exceeded 72 inches at the sampling <br />location. Within this revision area, 2.4 feet of soil was removed <br />and will be replaced. On the remainder of the currently permitted <br />area, the operator has salvaged and has or will replace an average <br />of 6 inches of soil material. <br />A separate study was done by Mariah Associates on the soil <br />resources of the Federal Lease Area (August 1983). This study <br />identified four soil types, including variants of the previously <br />described Nunn and Carracas loams, a rock outcrop complex, and a <br />Celacy variant loam. The rock outcrop complex provide no usable <br />soil material. The Celacy loam at the sample site contained a <br />3-inch thickness of the A horizon, 8 inches of B21t and 622t <br />horizons, and 7 inches of C horizon. All of this loam material is <br />suitable for topsoil stripping. <br />IV. Sealing of Drilled Holes and Underground Openings <br />A. The Division will require that each hole, well or other underground <br />opening will be capped, sealed, backfilled, or otherwise properly <br />managed (4.07.3). <br />V. Backfilling and Grading <br />A. As noted earlier, Kaiser Steel Resources has completed all <br />backfilling and grading at the mine site. A complete 60 percent <br />Phase I bond release was approved in 1992. <br />VI. Revegetation - Rules 2.04.10, 2.05.4(2)(e), 4.15, and 4.18(4)(1) <br />A. The Division has reviewed the permit application for compliance <br />with these sections. Information on baseline vegetation for the <br />approved permit area can be found in Section 2.04 of Volume I and <br />Exhibit 5. Information on the revegetation plan and revegetation <br />-14- <br />