Laserfiche WebLink
Runoff from the Barren Ridge and Federal Lease Areas of the <br />mine is passed through one of two sedimentation ponds. These <br />ponds (Nos. 004 and 005) serve to detain the runoff for at <br />least 24 hours to allow solids to settle out. The resulting <br />discharge is able to meet federal and state water discharge <br />standards (NPDES limits). The Division reviewed the adequacy <br />of the operator's sediment control system to ensure that the <br />water quality discharge standards from these ponds will be met. <br />The permittee's surface water control plan does not call for <br />the permanent impoundment of water. Sediment ponds at the site <br />are the only structures that impound water, and then only in <br />the event of precipitation. In addition, all sediment ponds <br />must be dewatered within 36 hours of a precipitation event. <br />The surface water monitoring frequency and analysis will be <br />performed using the parameters listed below. <br />Monitoring Site <br />Designation Flow Measurement <br />Frequency Water Sampling <br />Frequency <br />Sl Quarterly Semi-Annual <br />52 Quarterly Semi-Annual <br />53 Quarterly Semi-Annual <br /> Required Parameters <br />pH (Field) Sulfate <br />Conductivity at 25°C (Field) Aluminum <br />Total Dissolved Solids Iron <br />Total Suspended Solids Manganese <br />Oil and Grease Zinc <br />Sodium Adsorption Ratio Calcium <br />Bicarbonate Nitrate <br />Magnesium Sodium <br />The results of the monitoring program must be submitted to the <br />Division semi-annually. <br />Transfer of Wells <br />III <br />The Division proposes to approve transfer of a <br />located in the SE 1/4 of Section 30, T 34 N, R <br />This proposal is based on the fact that a well <br />obtained from the State Engineer, and written <br />transfer have been received from the applicant <br />owner (4.05.14(3)). <br />TOp50j1 <br />monitoring well <br />4 W, N.M.P.M.. <br />permit has been <br />~equests for the <br />and the surface <br />Soil resources information and the topsoil management plan have <br />been reviewed by the Division. Baseline soils information for the <br />-13- <br />