My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49746
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:29:20 PM
Creation date
11/23/2007 5:23:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976032
IBM Index Class Name
General Documents
Doc Date
3/21/2001
Doc Name
MEMO OF UNDERSTANDING BETWEEN URDA FOREST SERVICE AND THE TELLURIDE GRAVEL INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e N~~u- <- ~r',1 <br />..~ III III III IIIIIIIIII ~. / <br />78 Agreement No. <br />NS110RANDOM OT UNDSAOTANDINO <br />' between <br />DBDA FOR8ST. 8SRYICS <br />and tho <br />TBLLVRIDB OR~VBL, INC. <br />Re~~~~~d <br />MAR 21 ?ppl <br />D~ <br />O• • rd <br />e <br />m8ron o~,yine ~~8 tlioe <br />TxIB !lH16oRANDIJN O1 UNDSRBTANDINO ie hereby entered Snto by and between the GBOig9y <br />USDA Forest Service hereinaEtar referred to as the FOYeat 9eYVide, and the <br />'t'elluride Gre vel, Int. hereina£tar refrzrad to ae Telluride Ozavel <br />A. PORF08S. <br />The Telluride Ozavel acid the Forest 9e rvice are desirous of improving the <br />aesthetics and aquaticlriparian stability of the Confluence of the San <br />Miguel and South Fork of the San Miguel rivers. <br />e. BTASSI6HNT 09 WTOAL INTSR88T8 ANi1 eSNBBIta. <br />It 1e in the beat interest of Telluride oravel and the Forest Service to <br />resolve unwillful tra5paee in a cooperative manner. IC in also in the <br />beat interest of the public, both socially and environmentally, to have <br />the project come to completion. <br />C. FOR88T 86RVICS SHALL: <br />1. Be r6aponaible for providing final plane end drawings for the project. <br />2. Provide grade and elevation staking end surveying for the project. <br />3. waive the costa of royalties and land damages due the government in <br />lieu ^E work performed ($40,SOO and $16,000 respectively). <br />4. Inepeet tlia progreae of work and make changes ae necessary to the <br />completion of a quality job. <br />5. Cancel the Bill for Collection far $566,190 issued on 10/5/94 upon <br />c^mpletion of the work. <br />6. obtain a 404 permit from C.O.E. and adhere to its provisions. <br />7. Conduct monitoring required in 404 permit. <br />2, The TSLLUAIDa GAAViL shall: <br />1. Agree to scope of work to be pert ormnd to offset C.3. above. <br />2. Proviflo the Forest Service with a schedule of planned actions to <br />accomplish tl~ie work. <br />3. Furnish the required equipment and workforce Co accomplish the agreed <br />to work ae set Fotth in the final plans, dr~winga and apacifioetione. <br />
The URL can be used to link to this page
Your browser does not support the video tag.