My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49742
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:29:20 PM
Creation date
11/23/2007 5:22:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980002
IBM Index Class Name
General Documents
Doc Name
BID
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction <br />activities and ensure that each work item is completed and constructed to design <br />specifications. The PROJECT MANAGER will be available during regular business hours <br />(8:00 A.M. to 5:00 P.M.) on weekdays. Inspections will not be scheduled on weekend <br />days or holidays without prior approval of the PROJECT MANAGER. It is the Contractor's <br />responsibility to schedule inspections with the Project Manager so as not to delay the <br />work. The following items must be observed and approved by the PROJECT MANAGER <br />before proceeding with additional work: <br />Trash removal before proceeding with earthwork procedures; <br />2. Coal waste and concrete placement prior to further earthmoving; <br />3. Additional machine time as directed by the PROJECT MANAGER, and <br />4. Seedbed preparation prior to further revegetation procedures. <br />m:\inp\ppk\ohio.bid <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.