Laserfiche WebLink
<br />line COM Inc. is currently looking et other options Cor a decant systrnt that will be uuhtded in the <br />design speafica¢ons. <br />e) As part oCthe design of Ute new embankment, an earthquake analyses will be made for a meximtrm <br />credible eerUtgtuke. <br />fl COM, Inc. pleru on tnstalletion aC some testing method to detrnnine the phreatic surface in the darn, <br />but has not decided on the prcfeaed method yet Tite Cued method oC ttsRng the phreaac surface wilt <br />be covered in the design epect5csdona <br />gl 'The method that COM, Inc is currently ieviewir[g ee aR entbsnldnent raise should not have any filter <br />compatibility problems <br />29. 'Rte monitoring daacribed to tltia section applies to an upstrear race. COM, Inc u not pknnittg on an <br />upstream nuae. <br />30. The decant lines N the tailings impotutdrtient will be grouted closed to a point just below the impoundment <br />whae a trolvc u presently located..4ll surface line going to the Hazel A edit wUl be removed. <br />31 TWo of the monitor wells were installed by the Bureau of Mines Prior to the installation of the Gold Hill <br />Mill. In order to abandon the wells, COM, Lnc. a the Divisstm will have to get permission from the Bureau <br />oC Mirtea to abandon the wells. Since the wells wen installed by the E3ureau oC Mines, he coat of <br />abandonment should be home by the Bureau unless some ttnlrnown agreement was made with th< presrnt <br />lendown:r, Mi Vida, 'Rte two monitor welt installed by Gold Hill Ventures will be sealed. The cost of <br />sealing the two wells will be included to the reclamation cost. <br />COM, lrtc. will include the crnt of 4 quetters of groundwater monitoring in the bond estrmete. <br />32. The Time mine adit and Hazel A edit are owned by Mi Vide and arc only beutg used for water storage by <br />COhI. trio. as s pail oC Ute Mill access rights under the trii0 contract. Any sealing or safeguard wets wiU <br />revxt back to the owner at the time of final reclamation. <br />As mentioned to Item I, there is no ptrmphouse on Left Hand Creek end COM, Inc. is leaning the pump and <br />ute Crom the owner. Tht pttmp will left for two by Ute owner. A cost to remove and dlspou of the pipeline <br />will be included in the bond permit. <br />33. The road between the null end teilirgls area was installed by the Forest Service and Bureau of Mmes az an <br />access road to the Burcau'a teat holes and other Forest Service roads m the area. The road will test be <br />upgreded above the crntdition oCsimiler roads in the a[ea. <br />.4 wst to remove and dispose of the fence around the tailings pond will be included in the bond estitnate. <br />34 Addidonal see and slwb planting ere included in fhe raolamation eshmete elortg wnh tha looetion of the <br />plantings <br />35 All reclamation coats have been cotuohdamd into "Exhibit D", Reclama¢on Bond Calculations <br />