Laserfiche WebLink
<br /> <br />Gold Hill Mill Ad auacv Review Resoonae Mar 2 1995 <br />27. a) The only available as-built topogtaphrc information and sections were sent to the Division on April 2Q <br />1995 by Mark Steen of hli Vide Enterprises. We have no documenunon on foundation characterisRCs <br />or foundation atrrfice preparation <br />b) Dtmeruione of the existing starter dam u shown tit plan end close uchone from Mark Steen are: <br />Cteet Elevatiore. NA <br />Crest 1L'idth: f 0 to 11 feet nontirtel <br />Crest [.ertgth: Approx. 370 feet <br />Upatteem Slope Angle I .fi:l to greats than 3:1 <br />Downstrctrm Slope Angle Approx. I.S:I <br />cl No information is ctrrratdy avedable on embankment materials. COM, Ina. wtll attempt to rake <br />samples for analysis as soon es weather conditions allow work on-site to restune. A report dated <br />November t I, 1985 from Denver Ertgureeting Corpomhon indicated that the ceilings pond was <br />constructed to meet plans and specifications <br />d) A cottsttuction ducription letter from MI. Mark Stern, dated July 16, f 987 to the Division, luCs the liner <br />es a 30 trail potyethylerte liner. A copy of the letter ie attached. AQ flaws tit the liner will be patched by <br />a qualified company by the end of Jtme. <br />e) The decant line is a '.-inch HDPE line wtth three risers (open pipe tees) placed at equal distances along <br />the lute. The line rs about 250 feet long and u prated on top of the tailings in the water pottding area. <br />The pipe is connected to a 1-inch PVC standpipe that is I«sted at the south end of the pond. The <br />atandppe goes horrzontallythrough the liner and embenlmtertt at the bottom o(the pond. We have no <br />details on the startdptpe as if goes throtrgh the liner or the embenlatrnt. The 2•ineh PVC pipe u buried <br />to a point just below the beae of the embenktttent where a valve box is located. The 2•inch PVC <br />pipeline then u laid an the sttr(ace of the ground down to tfie Haul A edit (see Erdtibrt A) where the <br />pipeline goer throttgh s short urdirted borehole and into the hori7mital Haul A edit. The pipeline <br />exttmds back tiom the portal apprtntimateiy )0 feet whce the pipeline discharges behind a wooden <br />btdkhead slut contains the water in the mine workutgs that ere connected to the time and Wynona <br />mines. Water 5om heft Hand Crxk is also pumped 3,900 feet through the 2-inch pipeline located ht <br />Akira Gulch end situated on property ptuchescd by C.O.M. Inc. to a point north of County Roed No. <br />52 where the water litre enter the portal of the Time mint. A bulkhead u constructed in the Time rttine <br />adtt and water is dischuged from the pipe into the Time mute wockirtgs behind the bulkhead. The Time <br />mine adtt passes 45-feet below County Road No. 52 end exttmds 395 feet u. a southeasterly direction <br />where the Time mine u connected with the Wynona mme by a SO-foot dap win7,e. Roth the Time and <br />Wynonn rttittes are being wed to store water for milling operations for the period between Novanber I <br />end May 31. Mill water is drawn from the workittge by pumping the water out of the Wynone mine <br />shaft. <br />28. a) An upstream raise will nor be used for raising the e:nbatdtrnrnt The base of the starter dike vnll be <br />~d by going dowtutream _ feet and s~rtrtg a new cmbartkment with 1.5: i upsteam and <br />downstream slopes. The new embardmient will tie into the existing embertlattent and use the upstream <br />slope es paA of Nc upstream slope of the new cmbanktttent. Triaxiel shear and pore pressure test, vn71 <br />be done an samples fttrm the e.~tisting starter dike. <br />bj COM, Inc. curtcrttly plans to rue material'lrpetrcem t4om the existing t°'t' ~. pond as bonow for the <br />new anbenkmmt. The bonow materiel will be tasted as part of the design and specifications that wily <br />be prepared far the new embanlanent Qtutliry a>sirrance testing will be included in the specificahnrts <br />that asli be even to the ditisron For approval prior to embankment coruwction. <br />c) Cross aeetiotu will be included a6 put of the desip2t epecifiea4ona. <br />d1 Desrgri apecificationa for the mnbankmmit will include liner installation and quality esarus~nee <br />spect9canons. COht, inc. does nor plan to erttend the liner nn [rte upstream side of die new <br />embankment, but will include liner installation in the borrow uea ro a point above the find design 511 <br />