Laserfiche WebLink
<br />4. Wildlife Exposure Assessment <br />Reports submitted to the MLRB in January of 1999 indicated that the risk is minimal if <br />any to wildlife. <br />This five-acre parcel does not contain a water source and it is not a disposal site. This is <br />utilized to handle the disposal and loading of CKD material. The risk is minimal to any <br />wildlife hattn in this additional five-acre parcel. <br />5. Reclamation Costs <br />Reclaniation costs aze as follows: <br />• Estimated costs provided by a contractor aze $480,000 for demolition and disposal of <br />structure/foundation. <br />Structural steel will be disposed off-site and demolished concrete will be disposed in <br />• mined ou[ quarry areas. <br />• Additional costs are as follows: <br /> SEEDING <br />!acre DOZER <br />!cu d SCRAPER <br />!cu d TOPSOIL <br />! cu d <br />YEAR 2000(5) 248.00 1.00 2.00 x:.00 <br /> <br />Total (5)/5 acres 1240.00 4700.00 3740.0 1(1,000 <br />Total $19680.00 <br />• The total cost summary for demolition, disposal, and reclamation is $499,680.00. <br />• <br />4 <br />