Laserfiche WebLink
<br />TABLE 2-9 <br />IMPACT SUMMARY <br /> p..:::::.:: cce era ....:.. eve opmegt .: :::: :.::.: .: ::: :•: <br />.:: <br />......... ...:....... . <br />ot:p ...; <br />T a <br />ten a act b esource ...:.: <br />Yp? :...............P.....y......... ..: ......: <br />:::: <br />.:.:...: i : ;.;::::...:.- :. ... ....:....:... <br />:::. Ereeance...tc....:.. ...::.:Plpelrne::::.-.: Neeachutq:SiM.:::::. <br />:::.... <br />:.::-;::.Pfeeance.57te'::;..:. <br />.......... . <br />,. <br />::;::.':::::.::Pi elirie;:''.:;.:::::' .:..::-Pararh..icfe:S.lte: ': <br /> <br />: <br />: <br />:..::......:.....::.................:.:::.:...:....:.......:::.:..LandUsA:ariA 6erratioa.::;::.::::.:::.'::.::::.:::...:.;:..-.:.;:;:..::.:,,;;. <br />...... .::::...:;.:;..: :::: <br />.:.:.:::,.::;:.:.:.::•. <br />:.::'.:::;::: <br />,.::.: <br />• Conflict with adopted land use policies Project does not Project dots not Projcet does not Same as Proposed Same as Proposed Same as Proposed <br /> conflict with land use con0icl with land use conpict with land use Ac[ion Ac[ion Action <br /> politics or goals o(the policies or goals of the policies or goals of <br /> BI.M, or Rio Blanco BLM, or Rio Blanco the BLM, or Rio <br /> and Garfield counties. and Garfield counties. Blanco and Garfield <br /> Would require Cederal Would require federal counties. Would <br /> and local special use and local special use require federal end <br /> permits. pertnils. local special use <br /> permits. <br />• Effects on existing land use Minor impacts to No significant change No significant change Minor impacts to No significant change No significant change <br /> forage availability forage availability <br /> (loss o(6 AUMs) and (loss of 13 AUMs). <br /> some loss in hunting Greater area of deer <br /> opportunities, displacement and lost <br /> hunting opportunities. <br />• E(fecls to Ryen Gulch ACEC Would not meet BLM No efTecl No effect Same as Proposed No etTect No effect <br /> land management Action <br /> policies. Available <br /> mitigations ntay put <br /> project in compliance <br /> with management <br /> goals (or the ACEC. <br />sua esaurces:::.-;::.:.':" ::::::::::.:.:::...::.::::.:..:::...-.....-::;:.;....,......: <br />.............. <br />• ECfects to the existing scenic quality Physical alteration of Mostly an incremental No major eltange to Same as Proposed Same as Proposed Same as Proposed <br /> the existing landscape increase in the Ilte existing visual Action, but with a Action Action <br /> would he substantial existing line, color, quality. greater area of <br /> in some areas, and texture contrasts disturbance. <br /> changing a mostly caused by existing <br /> natural appearing pipeline ROWS. <br /> landscape to an <br /> industrial site. <br />Sheet 7 of 12 <br />