Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />t <br />f <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />I <br />1 <br />TABLE 2-1 <br />SUMMARY OF THE MAJOR COMPONENTS OF THE PROPOSED ACTION <br />Pt1RACI3F7`1CES~E'::::::':.::' :.:::.:.....:::::::::':',::::::::;;::::::!,;;.';.;::' :,'.::::: <br />- Water treatment plant <br />- Pumphouse <br />- Two conveyor galleries <br />• Refurbished existing industrial areas/facilities <br />- Topsoil stockpile <br />- Water storage pond: 2.8 acres surface area <br />- Evaporation pond: 15 acres surface azea; fluid streams include RO reject, sand filter discharge and <br />boiler blowdown <br />- Wazehouse, maintenance shop, locker rooms, administration and laboratory building, firehouse and <br />clinic to be developed within existing buildings <br />- Existing fire water pump building, boiler water treatment building, reagents building, cooling tower, <br />solution receiving tank, return water tank, substation to be refurbished <br />- Refurbish existing 4-mile railroad spur <br />• Utilities <br />- Water consumption and source: listed under Piceance Site components <br />- Natural gas: provided by an existing pipeline <br />- Electricity: provided by Public Service Company of Colorado via an existing 230-kV line; 1 existing <br />substation to be refurbished; back-up provided by on-site emergency generators <br />• Access <br />- Existing Garfield County Road 215 (Pazachute Creek Road) <br />Sheet 3 of 3 <br />