Laserfiche WebLink
TABLE 2-1 <br />SUMMARY OF THE MAJOR COMPONENTS OF THE PROPOSED ACTION <br /> .:.:..:....::.:::•.;:.;.::...::..:;.;.::.::::;.:'PIGF.i4NTGE:.:S1TiE::::::::::':::..:.'.'::'.'':::::' ::::::.::::'.::::::;;:;:,;. p ,p:::::'":: <br /> - Evaporation pond: 13 acres surface area <br /> 0 fluid streams include cooling tower blowdown, boiler blowdown, and pressure filter waste solids <br /> - Other permanent features: substation, generator, outdoor switch gear, pipeline feed surge tank, return <br /> water collection tank, cooling tower, parking lots, topsoil stockpile area, roads, utilities, and piping <br /> network <br />• Utilities <br /> - Water consumption: 1,158 ac-ft per year for solution mining and processing <br /> - Water source: Colorado River and alluvial groundwater wells in Pazachute Creek Valley; potable water <br /> trucked to site and stored in tanks <br /> - Natural gas: needed for on-site boilers, provided by new pipeline <br /> 0 Two pipeline alternatives: (A) 1.9 miles and (B) 8.5 miles <br /> - Electricity: provided by White River Electric Association via new 138-kV transmission line (to be <br /> analyzed by others); back-up provided by on-site emergency generators <br /> ....................::.:..::..:::::.::.::....::::.::.:.::....P FTfI11tE <br />• Approximately 44 miles long between the Piceance and Parachute Sites <br />• Diameter: 10.75 - 14 inches (to be determined) buried 3 - 5 ft. below ground surface <br />• Construction ROW: 125 fr. <br />• Operational ROW: 30 - 50 fr. <br />• Two pipelines placed in a single trench <br /> - Product pipeline from Piceance Site to Parachute Site <br /> - Return water pipeline from Pazachute Site to Piceance Site <br />• Two electric pump stations located at the Piceance and Parachute plant sites <br /> <br />3'ARA~IEi~'~'E .5L'CE <br />,..... <br />. ;:.:::: <br />::: <br />• g <br />Usin existin inactive Unocal Shale Oil Upgrade Facility <br />g, <br />• 304 acres enclosed by a fence <br />• New development: <br /> - Processing plant and associated substation <br /> - Rail and truck loadout facilities (9,400 fr. of new track) <br /> - Stormwater retention pond: 1 acre surface area <br /> - MVR purge pond: 2] acres; fluid streams include discharge from final processing equipment <br /> - Three soda ash storage silos <br />Sheet 2 of 3 , <br />